This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The package MD07 (Production Lot Planning) is a standard package in SAP ERP. It belongs to the parent package APPL.
Package | MD07 |
Short Text | Production Lot Planning |
Parent Package | APPL |
SAP Package MD07 contains 1 function groups.
MD07 | Production Lot Master Data |
---|
SAP Package MD07 contains 3 transactions.
MDL1 | Create Production Lot |
---|---|
MDL2 | Change Production Lot |
MDL3 | Display Production Lot |
SAP Package MD07 contains 1 views.
V_PRPMM | View for Search Help PRPMM |
---|
SAP Package MD07 contains 2 structures.
PLP_DATA_INC | PLP: Data Part - Include Production Lot Master Data |
---|---|
RMDPL | Input/Output Fields for SAPLMD07 |
SAP Package MD07 contains 1 search helps.
PRPMM | WBS Element, Production Lot |
---|