This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table CRCA (Work Center Capacity Allocation) is a standard table in SAP ERP. It belongs to the package CR.
Table | CRCA |
Short Text | Work Center Capacity Allocation |
Package | CR |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
OBJTY | ✔ | Object types of the CIM resource | CR_OBJTY | CHAR | 2 | |
OBJID | ✔ | Object ID of the resource | CR_OBJID | NUMC | 8 | CRID |
CANUM | ✔ | Capacity allocation number | CR_CAPNUM | NUMC | 4 | |
BEGDA | Start Date | BEGDATUM | DATS | 8 | ||
ENDDA | End Date | ENDDATUM | DATS | 8 | ||
AEDAT_KAPA | Changed on | AEDTM | DATS | 8 | ||
AENAM_KAPA | User Name | USRNAME | CHAR | 12 | ||
KAPID | Capacity ID | KAPID | NUMC | 8 | KAKO | |
FORK1 | Formula for setup capacity requirements | AP_FORM_K1 | CHAR | 6 | TC25 | |
FORK2 | Formula for processing capacity requirements | AP_FORM_K2 | CHAR | 6 | TC25 | |
FORK3 | Formula for teardown capacity requirements | AP_FORM_K3 | CHAR | 6 | TC25 | |
FORKN | Formula for cap. reqmts. for other types of int. processing | AP_FORM_KN | CHAR | 6 | TC25 | |
PROZT | Percentage share of available capacity | AP_PROZ_KA | NUMC | 3 | ||
VERT1 | Distribution of capacity requirements (Planned/prod.order) | CR_VERT1 | CHAR | 8 | TC29 | |
VERT2 | Key for distributing requirements over processing time | CR_VERT2 | CHAR | 8 | TC29 | |
VERT3 | Distribution key for teardown requirements | CR_VERT3 | CHAR | 8 | TC29 | |
VERTN | Distr.cap.reqmts (plant maint.,process order, network) | CR_VERTN | CHAR | 8 | TC29 | |
CAROL | Role of work center capacity | CR_CAPROLE | CHAR | 40 | ||
ISTBED_KZ | Calculation of actual capacity requirements | CY_ISTBEDKZ | CHAR | 1 | ||
VGWT1 | Actual requirements for operation segment setup | CY_VGWT1 | CHAR | 6 | * | |
VGWT2 | Actual requirements for operation segment processing | CY_VGWT2 | CHAR | 6 | * | |
VGWT3 | Actual capacity requirements for operation segment teardown | CY_VGWT3 | CHAR | 6 | * | |
VGWTN | Actual capacity requirements for in-house processing | CY_VGWTN | CHAR | 6 | * | |
CAP_BACKFLUSH_SU | Control: Calc. of Remaining Req./Duration After Confirmation | CAP_BACKFLUSH | NUMC | 1 | ||
CAP_BACKFLUSH_PR | Control: Calc. of Remaining Req./Duration After Confirmation | CAP_BACKFLUSH | NUMC | 1 | ||
CAP_BACKFLUSH_TD | Control: Calc. of Remaining Req./Duration After Confirmation | CAP_BACKFLUSH | NUMC | 1 |