Alle Technologien in einem Band! Ob Sie zukunftssichere Erweiterungen programmieren oder mit den Modifikationen in Ihren SAP-Systemen aufräumen möchten – hier erhalten Sie das erforderliche Wissen. Jede Methode wird ausführlich und mit Codebeispielen erläutert: User-Exits, klassische und neue BAdIs, Business Transaction Events, implizite und explizite Erweiterungspunkte u. v. m.
Bei amazon.de ansehen →The table TCX00 (Scheduling: Planning Levels and Control Parameters) is a standard table in SAP ERP. It belongs to the package CX.
Table | TCX00 |
Short Text | Scheduling: Planning Levels and Control Parameters |
Package | CX |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
AUFTG | ✔ | Order group for capacity planning | AUFTG | CHAR | 2 | |
AUFTA | ✔ | Order type in capacity planning | AUFTA | CHAR | 4 | |
VAGRP | ✔ | Production Supervisor | FEVOR | CHAR | 3 | T024F |
PHORI | Scheduling horizon (detailed planning) | PHORI | NUMC | 3 | ||
APLS1 | Selection ID (detailed planning) | APLS1 | CHAR | 2 | TCA43 | |
TERM1 | Lead time scheduling (detailed planning) | TERMX | CHAR | 1 | ||
KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | KAPKX | CHAR | 1 | ||
PHORI_2 | Scheduling horizon (detailed planning, medium term) | PHORI_2 | NUMC | 3 | ||
APLS1_2 | Selection ID for routing (detailed planning, medium term) | APLS1_2 | CHAR | 2 | * | |
TERM1_2 | Lead time scheduling (detailed planning, medium term) | TERMX_2 | CHAR | 1 | ||
KAPK1_2 | Create capacity requirements (detailed planning,medium term) | KAPKX_2 | CHAR | 1 | ||
PHORI_3 | Scheduling horizon (detailed planning, long term) | PHORI_3 | NUMC | 3 | ||
APLS1_3 | Selection ID for routing (detailed planning, long term) | APLS1_3 | CHAR | 2 | * | |
KAPK1_3 | Create capacity requirements (detailed planning, long term) | KAPKX_3 | CHAR | 1 | ||
TERM1_3 | Lead time scheduling (detailed planning, long term) | TERMX_3 | CHAR | 1 | ||
LINE_TERM | Takt time-/rate-based scheduling of planned order | LINE_TERM | CHAR | 1 | ||
RATHR | Rate-based planning horizon | RATHR | NUMC | 3 | ||
APLS2 | Selection ID (rate-based planning) | APLS2 | CHAR | 2 | TCA43 | |
TERM2 | Lead time scheduling (rate-based planning) | TERMX_RATE | CHAR | 1 | ||
KAPK2 | Create capacity requirements (rate-based planning) | KAPKX_RATE | CHAR | 1 | ||
GROHR | Rough-cut planning horizon | GROHR | NUMC | 3 | ||
APLS3 | Selection ID (rough-cut planning) | APLS3 | CHAR | 2 | TCA43 | |
TERM3 | Lead time scheduling (rough-cut planning) | TERMX_GROB | CHAR | 1 | ||
KAPK3 | Create capacity requirements (rough-cut planning) | KAPKX_GROB | CHAR | 1 | ||
DADJ1 | Scheduling level for adjusting basic dates | DADJ1 | CHAR | 1 | ||
DADJ2 | Adjust dates in lead time scheduling | DADJ2 | CHAR | 1 | ||
DADJ3 | Adjusting dates when dispatching planned orders | DADJ3 | CHAR | 1 | ||
TERMKZ | Scheduling type | TERMKZ | CHAR | 1 | T482 | |
TERM_AUTO | Indicator: Calculate dates automatically during saving | TERM_AUTO | CHAR | 1 | ||
PROT_AUTO | Display scheduling log automatically | PROT_AUTO | CHAR | 1 | ||
STVERG | Maximum number of days start date can be in the past | STVERG | NUMC | 3 | ||
MATFRUEH | Latest date for material staging | LAGE_FR | CHAR | 1 | ||
BREAKS | Indicator: Scheduling allowing for breaks | BREAKS | CHAR | 1 | ||
PROD_DATES | Scheduling based on production dates | PROD_DATES | CHAR | 1 | ||
AUF_SHIFT | Indicator: Shift order/network | AUF_SHIFT | CHAR | 1 | ||
REDST_MAX | Maximum reduction level | REDST_MAX | NUMC | 1 | ||
RED_ART | Reduction type | RED_ART | CHAR | 1 | ||
REDVS_S1 | Red. of floats before and after production (%) | REDVS_S1 | DEC | 3 | ||
REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | REDVS_S2 | DEC | 3 | ||
REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | REDVS_S3 | DEC | 3 | ||
REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | REDVS_S4 | DEC | 3 | ||
REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | REDVS_S5 | DEC | 3 | ||
REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | REDVS_S6 | DEC | 3 | ||
TERM_KPER | Rescheduling in Workforce Planning | TERM_KPER | CHAR | 1 | ||
CMACT | Assignment Material Staging Operation Segment | CMACT | CHAR | 1 |