Wenn der Standard nicht ausreicht: Mit diesem Buch lernen Sie, IDocs selbstständig zu programmieren und zu erweitern. Die Autorin beschreibt Customizing-Techniken, die Erweiterung der Standardbausteine und komplette Eigenentwicklungen. Ob Rückmeldungen von Statuswerten, E-Mail-Workflows oder Serialisierung – für alle Aufgaben finden Sie Anleitungen und Tipps aus der Programmierpraxis. Neu in dieser Auflage: Überwachung und Fehlerbehandlung mit dem SAP Application Interface Framework.
Bei amazon.de ansehen →The table TCX0L (Scheduling long term planning: Levels and control parameters) is a standard table in SAP ERP. It belongs to the package CX.
Table | TCX0L |
Short Text | Scheduling long term planning: Levels and control parameters |
Package | CX |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
AUFTG | ✔ | Order group for capacity planning | AUFTG | CHAR | 2 | |
AUFTA | ✔ | Order type in capacity planning | AUFTA | CHAR | 4 | |
VAGRP | ✔ | Production Supervisor | FEVOR | CHAR | 3 | T024F |
PLSCN | ✔ | Planning Scenario of Long-Term Planning | PLSCN | NUMC | 3 | PLSC |
SCHED_TYPE | Scheduling level | SCHED_TYPE | CHAR | 1 | ||
APLS1_LTP | Selection ID for routing (long term planning) | APLS1_LTP | CHAR | 2 | TCA43 | |
KAPK1_LTP | Create capacity requirements (long term planning) | KAPKX_LTP | CHAR | 1 | ||
TERM1_LTP | Lead time scheduling (long term planning) | TERMX_LTP | CHAR | 1 | ||
DADJ2 | Adjust dates in lead time scheduling | DADJ2 | CHAR | 1 | ||
DADJ3 | Adjusting dates when dispatching planned orders | DADJ3 | CHAR | 1 | ||
TERMKZ | Scheduling type | TERMKZ | CHAR | 1 | T482 | |
STVERG | Maximum number of days start date can be in the past | STVERG | NUMC | 3 | ||
MATFRUEH | Latest date for material staging | LAGE_FR | CHAR | 1 | ||
BREAKS | Indicator: Scheduling allowing for breaks | BREAKS | CHAR | 1 | ||
PROD_DATES | Scheduling based on production dates | PROD_DATES | CHAR | 1 | ||
REDST_MAX | Maximum reduction level | REDST_MAX | NUMC | 1 | ||
REDVS_S1 | Red. of floats before and after production (%) | REDVS_S1 | DEC | 3 | ||
REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | REDVS_S2 | DEC | 3 | ||
REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | REDVS_S3 | DEC | 3 | ||
REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | REDVS_S4 | DEC | 3 | ||
REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | REDVS_S5 | DEC | 3 | ||
REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | REDVS_S6 | DEC | 3 |