Alle Technologien in einem Band! Ob Sie zukunftssichere Erweiterungen programmieren oder mit den Modifikationen in Ihren SAP-Systemen aufräumen möchten – hier erhalten Sie das erforderliche Wissen. Jede Methode wird ausführlich und mit Codebeispielen erläutert: User-Exits, klassische und neue BAdIs, Business Transaction Events, implizite und explizite Erweiterungspunkte u. v. m.
Bei amazon.de ansehen →The table TCY08 (Option profiles) is a standard table in SAP ERP. It belongs to the package CY.
Table | TCY08 |
Short Text | Option profiles |
Package | CY |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
DARPROF_ID | ✔ | ID of a user-spec. profile in the table for option profiles | DARPROF_ID | CHAR | 10 | |
HIEVER | Cumulate capacity requirements using work center hierarchy | HIEVER | CHAR | 1 | ||
HIEAUF | Explode hierarchy | HIEAUF | CHAR | 1 | ||
KUMUL | Indicator, whether cumulated display is desired | KUMULD | CHAR | 1 | ||
MINBEL | Minimum load that will be displayed | MINBELA | DEC | 3 | ||
MAXBEL | Maximum load that will be displayed | MAXBELA | DEC | 3 | ||
RUECKDAT | Offset (in days) of dispatch date for backlog to curr. date | RDATUM_CNT | DEC | 5 | ||
PEINHEIT | Unit in which the period duration is specified (day, week..) | DAPER | CHAR | 1 | ||
PDAUER | Duration of a period (units as specified in period type) | DAPED | DEC | 3 | ||
LIBART | Requirements category (scheduled or remaining) | CY_SBART | CHAR | 1 | ||
ZAPER | Type of date specification | CY_ZAPER | CHAR | 1 | ||
LIDAVCNT | Offset (in days) of start date for lists to current date | CY_DCNTV | DEC | 5 | ||
LIDABCNT | Offset (in days) of end date for lists to current date | CY_DCNTB | DEC | 5 | ||
LIEINH | Unit of of measure for displaying capacity requirements | CY_KEINH | UNIT | 3 | T006 | |
DAVAP | Distribution according to key in work center or operation | DAVAP | CHAR | 1 | ||
HNAME | Name of hierarchy | CR_HNAME | CHAR | 10 | ||
HWERKS | Plant | WERKS_D | CHAR | 4 | T001W | |
VERTL1 | Distribution of capacity requirements (Planned/prod.order) | CR_VERTL | CHAR | 8 | TC29 | |
VERTLN | Distr.cap.reqmts (plant maint.,process order, network) | CR_VERTLN | CHAR | 8 | TC29 | |
POOLKAP | Indicator: Cumulated view of the rqmts of pooled capacity | CY_POOLKAP | CHAR | 1 | ||
TT_FAUFT | Indicator: Branch to production order - change or display | CY_TTFAUFT | CHAR | 1 | ||
TT_PAUFT | Indicator: Branch to planned order display or maintenance | CY_TTPAUFT | CHAR | 1 | ||
TT_ARBPL | Switch: Branch to work center - change or display | CY_TTARBPL | CHAR | 1 | ||
ANVER | Cumulate available capacity using work center hierarchy | CY_ANVER | CHAR | 1 | ||
DATEFROM | Start date for output of capacity evaluations | CY_DATEF | CHAR | 10 | ||
DATETO | Finish date for output of capacity evaluations | CY_DATET | CHAR | 10 | ||
RDATE_TYPE | Type of date specification | CY_RDATETY | CHAR | 1 | ||
RDATE | Date of backlog dispatching | CY_RDATE | CHAR | 10 | ||
MRPP | PPC planning calendar | MRPPP | CHAR | 3 | T439G | |
UNITSOURCE | Origin of unit of measure for available cap. and cap.reqmts | CY_UNITSRC | CHAR | 1 | ||
PPSWERK | Plant | WERKS_D | CHAR | 4 | T001W |