Menu

SAP Message Class MF

MPS-Planung und Auswertung

Recommended Now

All-new Echo Dot Smart speaker with Alexa

This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.

Check it out on amazon.com →

The Message Class MF (MPS-Planung und Auswertung) is a standard Message Class in SAP ERP and is part of the package MD03.

Technical Information

Message Class MF
Short Text MPS-Planung und Auswertung
Package MD03

Messages

ID Language Text
000 D
002 D Das Layout & ist nicht vorhanden
006 D Keine Zusatzinformationen vorhanden
007 D Keine Ausnahmemeldungen zu diesem Material bzw. Produktgruppe vorhanden
009 D Keine abhängigen Dispositionselemente mit Problemen vorhanden
014 D Der Planauftrag & ist nicht vorhanden
015 D Der Fertigungsauftrag & & ist nicht vorhanden
016 D Die Bestellung & & ist nicht vorhanden
017 D Die Bestellanforderung & & ist nicht vorhanden
018 D Die Lieferplaneinteilung & & ist nicht vorhanden
023 D Die Produktgruppe &1 ist im Werk &2 nicht vorhanden
024 D Keine aktive Version der Grobplanung für Produktgruppe & vorhanden
025 D Der Kundenauftrag & & ist nicht vorhanden
026 D Das Material & wurde in keinem Werk gefunden
027 D Es wurden keine Zugänge gefunden, die den Bedarf decken
028 D Die Reservierung & & ist nicht vorhanden
029 D Der Netzplan & ist nicht vorhanden
035 D Produkt/Wirkstoffmengeneinheit nicht gefunden.
100 D
101 D Das Layout wurde gesichert
102 D Das Auswertungsprofil & wurde gesichert
103 D Das Auswertungsprofil & wurde gelöscht
106 D Die Korrektur & wurde geändert
107 D Ermittlung der Destinationen einer verteilten Systemumgebung (ALE)
108 D Lesen Planungssituation für & & im eigenen logischen System
109 D Lesen Planungssituation für & & in dem System mit der RFC-Destination &
110 D Lesen Planungsergebnis für & & im eigenen logischen System
111 D Lesen Planungsergebnis für & & im System mit der RFC-Destination &
112 D Lesen Langfristplanung für & & im eigenen logischen System
113 D Lesen Langfristplanung für & & im System mit der RFC-Destination &
114 D Lesen Planungssituation für Material & im Werk &
115 D Auftragsbericht wird aufgebaut (bisher & Materialien gelesen)
200 D
201 D Bitte wählen Sie mit dem Cursor ein Zu- oder Abgangselement aus
204 D Bitte vervollständigen Sie den Eintrag in Zeile &
205 D Bitte geben Sie in Zeile & das Dispoelement oder untergeordnete Knoten an
206 D Bitte überprüfen Sie Ihre Eingabe
208 D Bitte geben Sie das Dispositionselement oder eine Sonderfunktion ein
210 D Bitte markieren Sie mindestens eine Zeile
212 D Bitte vervollständigen Sie Ihre Eingaben
300 D
301 D Die ausgewählte Funktion ist für das Element nicht durchfürbar
302 D Funktion ist für das Element in der Dispoliste nicht durchführbar
305 D Gleitender Durchschnittspreis im Materialstamm nicht gepflegt
306 D Standardpreis im Materialstamm nicht gepflegt
307 D Zukünftiger Preis im Materialstamm nicht gepflegt
308 D Steuerrechtlicher Preis im Materialstamm nicht gepflegt
309 D Handelsrechtlicher Preis im Materialstamm nicht gepflegt
310 D Währungsumrechnung von & nach & nicht möglich
311 D Der Eintrag & existiert bereits. Bitte wählen Sie einen anderen Namen
312 D Löschen nicht möglich. Es existieren noch untergeordneten Elemente
313 D Eine Zeile mit Dispoelement kann nicht weiter aufgelöst werden
314 D Die Werte liegen zum Teil außerhalb des darstellbaren Zahlenbereiches
315 D Es sind nicht genügend Werte für eine graphische Ausgabe vorhanden
316 D Fehler bei der Kommunikation mit Destination &
317 D & ist eine Produktgruppe. Bitte benutzen Sie die Produktgruppenauswertung
318 D & ist ein Material. Bitte benutzen Sie die MPS-Auswertung
319 D Fehlerzustand in der Frontend-Software (Graphik)
320 D Ein Kundenauftrag oder eine Vorplanung ist Verursacher von sich selbst
321 D Keine lagerhaltigen Typen zum konfigurierbaren Material & vorhanden
322 D & ist kein konfigurierbares Material
323 D Beim Lesen der Daten gab es einen Fehler. Siehe Protokoll
324 D Das Auswertungsprofil & ist nicht richtig gepflegt
325 D Werk & nicht im Verteilungsmodell gefunden. Lese Daten im eigenen System
326 D Für Kundenauftrag & & existiert kein dispositionsrelevanter Bedarf
327 D Es wurde kein weiteres Dispositionselement gefunden
328 D Zum Projekt & existieren keine dispositionsrelevanten Reservierungen
329 D Beim Lesen der Daten sind keine Fehler aufgetreten
330 D Zum Netzplan & existieren keine dispositionsrelevaten Reservierungen
331 D Der Auftrag & enthält möglicherweise rekursive Komponenten
332 D Kein Bedarfsdecker für verbrauchsgesteuerte Komponenten ermittelbar
333 D Es ist kein weiteres Planungsergebnis markiert
334 D Erstes markiertes Planungsergebnis erreicht
335 D Planungskalender &1 verwendet von Material &2 &3. Löschen nicht möglich.
500 D
501 D Datum & nicht umrechenbar
502 D Datum & vor Fabrikkalender
503 D Datum & nach Ende Fabrikkalender
504 D Fehlender Fabrikkalender oder Fehler im Fabrikkalender &
505 D Woche & nicht umrechenbar
506 D Fehler bei der Umrechnung in Buchungsperioden (Version in Tabelle T009)
507 D Fehler bei der Umrechnung in Buchungsperioden (Perioden in Tabelle T009B)
508 D Datum &1 nicht im Planungskalender &2 ( Werk &3 )
509 D VON-Datum größer BIS-Datum
600 D
601 D Sie haben nur die Berechtigung zur Anzeige
602 D Sie haben keine Berechtigung diese Funktion durchzuführen
603 D Das Objekt ist gesperrt. Es kann nur angezeigt werden
604 D Sie haben keine Berechtigung für Werk &
605 D Sie haben keine Berechtigung für Werk &1 Disponent &2
606 D Sie haben keine Berechtigung für Werk &1 Planungsszenario &2
700 D Markieren Sie eine gültige Zelle, Zeile oder Spalte
701 D Markieren Sie genau eine Spalte
000 E
001 E Argument & not contained in table &
002 E Layout profile & does not exist
003 E Plant & does not exist
004 E Material & does not exist in plant &
005 E No MRP list exists
006 E No additional information exists
007 E No exception messages exist for this material or product group
008 E Element has no lower-level elements
009 E No dependent MRP elements exist for this selection
010 E No evaluation profile exists fot layout &
011 E Individual planning segment & & & does not exist
012 E MRP controller & does not exist in plant &
013 E Special procurement key & does not exist in plant &
014 E Planned order & does not exist
015 E Production order & & does not exist
016 E Purchase order & & does not exist
017 E Purchase requisition & & does not exist
018 E Delivery schedule & & does not exist
019 E No planned orders exist for this selection
020 E Planning ID & does not exist in plant &
021 E Production version & & & does not exist
022 E Run schedule & does not exist
023 E Product group &1 does not exist in plant &2
024 E No active version in SOP exists for product group &
025 E Sales order & & does not exist
026 E Material & was not found in any plants
027 E No dependent receipts were found that cover requirement
028 E Reservations & & does not exist
029 E Collective order & does nor exist
035 E Product unit/active ingredient unit of measure not found
100 E
101 E Layout was saved
102 E Evaluation profile & was saved
103 E Evaluation profile & was deleted
104 E The MRP list for material & & was deleted
105 E The processing indicator was set
106 E Correction & was changed
107 E Determination of destinations of a distributed system environment (ALE)
108 E Read planning situation for & & in own logical systems
109 E Read planning situation for & & in system with the RFC destination &
110 E Read planning result for & & in own logical system
111 E Read planning result for & & in system with the RFC destination &
112 E Read long-term planning for & & in own logical system
113 E Read long-term planning for & & in system with RFC destination &
114 E Read planning situation for material & in plant &
115 E Order report is being constructed (& materials read so far)
200 E
201 E Please select a receipt or an issue with the cursor
202 E Please select a valid line
203 E Please select clearly
204 E Please complete your entry in line &
205 E Please enter the MRP element or the sub-nodes in line &
206 E Check your entry
207 E Please enter the hierarchy element in line &
208 E Please enter the MRP element or a special function
209 E Please enter the material or the MRP controller
210 E Select at least one line
211 E Please indicate the block end
212 E Please complete your entries
300 E
301 E The selected function cannot be carried out for this element
302 E Function cannot be carried out for this element in the MRP list
303 E Conversion of units of measure & and & is not possible
304 E Quantity conversion is not possible ( & not in Table & )
305 E Moving average price not maintained in the material master
306 E Standard price has not been maintained in the material master
307 E Future price has not been maintained in the material master
308 E Tax price has not been maintained in the material master
309 E Commercial price has not been maintained in the material master
310 E Currency translation from & to & is not possible
311 E Entry & already exists. Please choose another name
312 E Delete function not possible. Lower-level elements exist.
313 E A line with an MRP element cannot be further exploded
314 E Some values lie outside the shown number area
315 E Not enough values exist for a graphical display
316 E Error in communication with destination &
317 E & is a product group. Please use evaluation for product groups
318 E & is a material. Please use MPS evaluation
319 E Error in frontend software (graphic)
320 E A sales order or an indep. reqmt is itself the pegged reqmt
321 E No stockable types exist for the configurable material: &
322 E & is not a configurable material
323 E Error reading data. See log
324 E Evaluation profile & has not been maintained correctly
325 E Plant & not found in distribution model. Read data in own system
326 E For sales order & &, no requirements exist in the master plan
327 E No further MRP element was found
328 E No reservations relevant to MRP exist for project &
329 E No errors occurred when reading data
330 E No reservations relevant to MRP exist for network &
331 E Order & possibly contains recursive BOM components
332 E No ord.proposal can be calculated for consumption-based components
333 E No additional planning result selected
334 E Reached first planning result selected
335 E Planning calendar &1 used by material &2 &3. Deletion not possible
500 E
501 E Date & cannot be converted
502 E Date & lies before the factory calendar
503 E Date & lies after the factory calendar
504 E Invalid factory calendar or error in the factory calendar &
505 E Week & cannot be converted
506 E Error in conversion to posting periods (version in Table T009)
507 E Error in conversion to posting periods (periods in Table T009B)
508 E Date &1 not in planning calendar &2 ( plant &3 )
509 E From date greater than to date
600 E
601 E You only have authorization for the dispaly function
602 E You do not have the necessary authorization to carry out this function
603 E Object is blocked. It can only be displayed
604 E You have no authorization for plant &
605 E You have no authorization for plant &1 MRP controller &2
606 E You have no authorization for plant &1 planning scenario &2
607 E Entry & could not be copied into the correction
700 E Select a valid cell, row or column
701 E Select exactly one column
995 E
998 E %NEM-&: &
999 E %N& &