This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The package RE_SC_GC (SCS: Get Costs) is a standard package in SAP ERP. It belongs to the parent package RE_SC.
Package | RE_SC_GC |
Short Text | SCS: Get Costs |
Parent Package | RE_SC |
SAP Package RE_SC_GC contains 2 function groups.
REDB_VISCS_DOCS_UPDATE | Update Task Direct on Contract |
---|---|
REDB_VISCSCOSTS_UPDATE | Update Task Determined Costs(VISCSCOSTS) |
SAP Package RE_SC_GC contains 1 transactions.
RESCGC | Cost Overview |
---|
SAP Package RE_SC_GC contains 2 database tables.
VISCS_DOCS | Costs Directly Assigned to Lease-Out |
---|---|
VISCSCOSTS | Determined Costs |
SAP Package RE_SC_GC contains 9 structures.
AVISCS_DOCS | Change Document Structure of Costs Posted Direct on Contract |
---|---|
AVISCSCOSTS | Change Document Structure for Determined Costs (VISCSCOSTS) |
RESCS_COSTS_X | Determined Costs + Addit. Information |
RESCSUCOSTHISTITEM | Costs for a Single Period |
RESCSUCOSTHISTORY | Cost Overview |
VISCS_DOCS_KEY | Key Fields for Table VISCS_DOCS |
VISCS_DOCS_TAB | Non-Key Fields of Table VISCS_DOCS |
VISCSCOSTS_KEY | Key Fields of Table VISCSCOSTS |
VISCSCOSTS_TAB | Non-Key Fields of Table VISCSCOSTS |
SAP Package RE_SC_GC contains 1 programs.
RFRESCGC | Cost Overview for Current Period and Prior Periods |
---|
SAP Package RE_SC_GC contains 1 message classes.
RESCGC | Fehler bei der Kostenermittlung |
---|