This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table KBKO (Header Record for Capacity Requirements) is a standard table in SAP ERP. It belongs to the package CX.
Table | KBKO |
Short Text | Header Record for Capacity Requirements |
Package | CX |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
BEDID | ✔ | ID of the capacity requirements record | BEDID | NUMC | 12 | |
TYPKZ | Category of object causing the load (order category) | TYPKZ | CHAR | 1 | ||
AUFPL | Routing number of operations in the order | CO_AUFPL | NUMC | 10 | ||
PLNUM | Planned order number | PLNUM | CHAR | 10 | PLAF | |
SAFNR | SOP order number | SAFNR | CHAR | 10 | ||
PLNTY | Task List Type | PLNTY | CHAR | 1 | TCA01 | |
PLNNR | Key for Task List Group | PLNNR | CHAR | 8 | ||
PLNAL | Group Counter | PLNAL | CHAR | 2 | ||
OBJNR | Object number | J_OBJNR | CHAR | 22 | ONR00 | |
TRMDT | Date of the last scheduling | TRMDT | DATS | 8 | ||
GLTRS | Scheduled finish | CO_GLTRS | DATS | 8 | ||
GLUZS | Earliest finish of operation (time) | FSEVZ | TIMS | 6 | ||
GSTRS | Scheduled start | CO_GSTRS | DATS | 8 | ||
GSUZS | Earliest scheduled start: Execution (time) | FSAVZ | TIMS | 6 | ||
TERKZ | Scheduling type | TERMKZ | CHAR | 1 | T482 | |
BREAKS | Indicator: Scheduling allowing for breaks | BREAKS | CHAR | 1 | ||
REDKZ | Reduction indicator for scheduling | REDKZ | CHAR | 1 | ||
TRMER | Scheduling error | TRMER | CHAR | 2 | ||
TRMHK | Scheduling source | TRMHK | CHAR | 1 | ||
PLAUF | Date for routing transfer | CO_PLAUF | DATS | 8 |