This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.
Check it out on amazon.com →The table T438M (Control Parameter for MRP -Material Level-) is a standard table in SAP ERP. It belongs to the package MD0C.
Table | T438M |
Short Text | Control Parameter for MRP -Material Level- |
Package | MD0C |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
MTART | ✔ | MRP Group | DISGR | CHAR | 4 | |
BANER | Creation Indicator for Purchase Requisitions | BANER | CHAR | 1 | ||
DISER | Creation Indicator for MRP Lists | DISER | CHAR | 1 | ||
UMTHZ | Rescheduling horizon | UMTHZ | NUMC | 3 | ||
FIXHZ | Planning time fence | FIXHZ | NUMC | 3 | ||
PLAHZ | Planning horizon | PLAHZ | NUMC | 3 | ||
SBDIS | Share of safety stock which can be used for planning | SBDIS | NUMC | 3 | ||
LIFKZ | Automatic Schedule Lines (Scheduling Agreements) | LIFKZ | CHAR | 1 | ||
GTERM | Scheduling according to purchasing info record or agreement | GTERM | CHAR | 1 | ||
KZDRB | Indicator: direct procurement/production MRP | KZDRB | CHAR | 1 | ||
XFAT1 | Firm Only Schedule Lines Transmitted to Vendor by Purchasing | XFAT1 | CHAR | 1 | ||
XFAT2 | Fant. 2 | XFAT2 | CHAR | 1 | ||
VWVOR | Tolerance value for bringing forward receipt elements | VWVOR | NUMC | 2 | ||
VWVER | Tolerance value for displacement in the future | VWVER | NUMC | 2 | ||
PRREG | Checking Rule for Availability Check | PRREG | CHAR | 2 | T441R | |
VRMOD | Consumption mode | VRMOD | CHAR | 1 | ||
VINT1 | Consumption period: backward | VINT1 | NUMC | 3 | ||
VINT2 | Consumption period: forward | VINT2 | NUMC | 3 | ||
STRGR | Planning strategy group | STRGR | CHAR | 2 | T461P | |
RESHZ | Roll forward period for the master plan | RESHZ | DEC | 2 | ||
ANDIS | Number of Days After Which the Material Must Be Planned | ANDIS | INT2 | 5 | ||
AUART | Order Type | AUFART | CHAR | 4 | T003O | |
AUAR2 | Order type for process order | AUAR2 | CHAR | 4 | T003O | |
PLSEL | Issue Storage Location Selection | PLSEL | CHAR | 1 | ||
RVPKZ | Adjustment of Planned Independent Requirements | RVPKZ | CHAR | 1 | ||
RESVP | Period of adjustment for planned independent requirements | RESVP | DEC | 3 | ||
SHFLG | Safety time indicator (with or without safety time) | SHFLG | CHAR | 1 | ||
SHZET | Safety time (in workdays) | SHZET | NUMC | 2 | ||
MDACH | Action control: planned order processing | MDACH | CHAR | 2 | T46AC | |
PRASTA | Period split | PRASTA | CHAR | 5 | T459S | |
EXSGT | Do not explode bulk material items | EXSGD | CHAR | 1 | ||
BESAL | Determination of explosion date for BOM and routing | BESAD | CHAR | 1 | ||
BSART | MRP:doc.type purchase requisitions for standard purchase ord | BBSRT_NB | CHAR | 4 | T161 | |
BARTL | MRP: Document type purchase requisition for subcontracting | BBSRT_LB | CHAR | 4 | T161 | |
BARTU | MRP: purchase requisition for stock transfer - document type | BBSRT_UL | CHAR | 4 | T161 | |
GRREL | Relevant for requirements grouping for project stock | GRREL | CHAR | 1 | ||
VERTR | Start date of order proposals allowed in the past | VERGR | CHAR | 1 | ||
FKOBS | ATP check by full confirmation logic | FKOBS | CHAR | 1 | ||
EVAPR | Evaluation Profile for Range-of-Coverage Data | MD_EVAPR | CHAR | 3 | T465 |