This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.
Check it out on amazon.com →The table T439A (MRP Lot Sizes) is a standard table in SAP ERP. It belongs to the package MD0C.
Table | T439A |
Short Text | MRP Lot Sizes |
Package | MD0C |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | * |
DISLS | ✔ | Lot size (materials planning) | DISLS | CHAR | 2 | |
LOSVF | Lot-sizing procedure for short-term period | LOSVF | CHAR | 1 | ||
LOSKZ | Lot-size indicator for the short-term period | LOSKZ | CHAR | 1 | ||
PERAZ | Number of periods for the short-term area | PERAZ | DEC | 3 | ||
TERBV | Scheduling for period lot sizes in short-term area | TERBV | CHAR | 1 | ||
UELAP | Overlap scheduling in the short-term area | UELAP | CHAR | 1 | ||
KFPKZ | Period indicator for calculating long-term planning | KFPKZ | CHAR | 1 | ||
KFPAZ | Number of periods for long-term lot size | KFPAZ | DEC | 3 | ||
LGLVF | Lot-sizing procedure for long-term lot-sizing | LGLVF | CHAR | 1 | ||
LGLKZ | Lot-size indicator for long-term lot-sizing procedure | LGLKZ | CHAR | 1 | ||
LGPAZ | Number of periods for long-term lot size | LGPAZ | DEC | 3 | ||
LGTER | Scheduling the long-term period lot-sizing procedure | LGTER | CHAR | 1 | ||
LGUEL | Overlapping indiactor for long-term lot sizing | LGUEL | CHAR | 1 | ||
LGMIN | Check minimum lot size | CHMIN | CHAR | 1 | ||
LGMAX | Check maximum lot size | CHMAX | CHAR | 1 | ||
KZSPL | Indicator: Splitting quota in short-term horizon | KZSPL | CHAR | 1 | ||
LGSPL | Indicator: splitting quota in the long-term horizon | LGSPL | CHAR | 1 | ||
INTKA | Interpretation of the planning calendar events | INTKA | CHAR | 1 | ||
LGINT | Iterpretation of MRP dates: long-term planning | LGINT | CHAR | 1 | ||
LGKND | Lot-size calculation in make-to-order production | LGKND | CHAR | 1 | ||
KZHOR | Horizon for lot-for-lot order qty | KZHOR | NUMC | 3 | ||
HBVAR | Maximum stock level variant | HBVAR | CHAR | 1 | ||
LASTL | Last lot exact | LASTL | CHAR | 1 | ||
UNTKZ | Underdelivery Tolerance | UNTKZ | CHAR | 1 |