This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The Message Class C7 (Terminierung) is a standard Message Class in SAP ERP and is part of the package CX.
Message Class | C7 |
Short Text | Terminierung |
Package | CX |
ID | Language | Text |
---|---|---|
000 | D | **** Meldungen, die ins Protokoll geschrieben werden |
001 | D | Terminierung abgebrochen: Datum und Terminierungsart prüfen |
002 | D | Terminierung abgebrochen: Mengeneinheit der Losgröße prüfen |
003 | D | Terminierung abgebrochen: Mengeneinheit der Losgröße prüfen |
004 | D | Kein Arbeitsplatz im Vorgang (Einsatzzeit über Kalender aus Vorgang) |
005 | D | Im Vorgang sind nicht alle Vorgabewerte gepflegt |
006 | D | Keine Termine für die Einschränkungen vorhanden |
007 | D | Termin für die Einschränkung konnte nicht konvertiert werden |
008 | D | Datum nicht im Fabrikkalender definiert |
009 | D | FHM: Endtermin liegt vor dem Starttermin, Endtermin = Starttermin |
010 | D | UVorg.: Endtermin liegt vor dem Starttermin, Endtermin = Starttermin |
011 | D | Endtermin liegt vor dem Starttermin, Endtermin = Starttermin |
012 | D | Terminierung abgebrochen: Keine Zeiteinheit für Tag definiert |
013 | D | Zeiteinheiten nicht vollständig definiert |
014 | D | Keine Einsatzzeit für die Terminierung am Arbeitsplatz gepflegt |
015 | D | Keine Kapazitätsart für die Terminierung am Arbeitsplatz gepflegt |
016 | D | Kalender nicht vorhanden |
017 | D | Kein Kalender angegeben |
018 | D | Arbeitsplatz nicht vorhanden |
019 | D | Eintrag in der Transportzeitmatrix nicht vorhanden |
020 | D | Feldüberlauf bei der Berechnung der Mengen der FHM |
021 | D | Feldüberlauf bei der Berechnung der Einsatzwerte der FHM |
022 | D | Termin kann nicht in das interne Format konvertiert werden |
023 | D | Fehler beim Umrechnen in andere Mengeneinheiten |
024 | D | Feldüberlauf bei der Berechnung der Dauer |
025 | D | Terminierter Start liegt nach dem terminierten Ende |
026 | D | Terminierungsart nicht definiert, Term.Art 'nur Kapazitätsbedarfe' |
027 | D | Mengeneinheit des Vorgangs ist ungültig |
028 | D | Kein Arbeitsplatz und Kalender im Vorgang |
029 | D | Horizont für die Terminierung nicht definiert |
030 | D | Starttermin in der Vergangenheit: Heute-Terminierung |
031 | D | Steuerschlüssel & nicht vorhanden |
032 | D | Terminierung abgebrochen: Terminierungsparameter fehlen |
033 | D | Einschränkung liegt vor dem Eckstarttermin |
034 | D | Einschränkung liegt nach dem Eckendtermin |
035 | D | Terminierter Start liegt vor dem Eckstarttermin |
036 | D | Terminiertes Ende liegt nach dem Eckendtermin |
037 | D | Terminkonflikt: Einschränkung liegt zu früh |
038 | D | Terminkonflikt: Einschränkung liegt zu spät |
039 | D | Einschränkung konnte nicht eingehalten werden |
040 | D | Terminkonflikt: Widersprüchliche Einschränkungen |
041 | D | Kein Arbeitsplatz in der AOB (Einsatzzeit über Kalender aus der AOB) |
042 | D | AOB: Keine Einsatzzeit für die Terminierung am Arbeitsplatz gepflegt |
043 | D | AOB: Keine Kapazitätsart für die Terminierung am Arbeitsplatz gepflegt |
044 | D | AOB: Kalender nicht vorhanden |
045 | D | AOB: Kein Kalender angegeben |
046 | D | AOB: Arbeitsplatz nicht vorhanden |
047 | D | AOB: Feldüberlauf bei der Berechnung des Zeitabstandes |
048 | D | AOB: Datum nicht im Fabrikkalender definiert |
049 | D | AOB: Termin kann nicht in das interne Format konvertiert werden |
050 | D | AOB: Fehler beim Umrechnen in andere Mengeneinheiten |
051 | D | Keine Einsatzzeit für den Transport in der Transportzeitmatrix gepflegt |
052 | D | Meilenstein &2: Termin liegt außerhalb der Vorgangstermine von Vorgang &1 |
053 | D | Feldüberlauf bei der Berechnung der Menge |
054 | D | PSP-Termin konnte nicht konvertiert werden. |
055 | D | Division durch 0 bei der Berechnung der Vorgangsmenge |
056 | D | Kapazität & nicht verfügbar |
057 | D | Keine Kapazität für Kapazitätsterminierung zugelassen |
058 | D | Anordnungsbeziehungen zu anderen Standardnetzen vorhanden |
059 | D | Terminierungsebene Fein - Auftrag & |
060 | D | Terminierungsebene Rate - Auftrag & |
061 | D | Terminierungsebene Grob - Auftrag & |
062 | D | ========================================================================= |
063 | D | Überlappung konnte nicht eingehalten werden |
064 | D | Mindestüberlappungszeit konnte nicht eingehalten werden |
065 | D | Auftrag & ist endrückgemeldet. Auftragsecktermine werden nicht verändert |
066 | D | Fehler bei der Terminierung von Splitts |
067 | D | Es sind nicht alle Vorgabewerte gepflegt |
068 | D | Liefertermin zum Material & haltbar? Realistischer Termin: & |
069 | D | FHM: Kein Stammsatz gefunden |
070 | D | AOB: Maximaldauer konnte nicht eingehalten werden |
071 | D | Vorgang ist eingeplant |
072 | D | Nach Einplanung: Auftrag beginnt in der Vergangenheit |
073 | D | Meilenstein &2: Termin liegt außerhalb der Termine des PSP-Elementes &1 |
074 | D | Termine von externem System gesetzt |
075 | D | Gesamtnetzterm.: Eckendtermin liegt vor terminiertem Endtermin |
076 | D | Gesamtnetzterm.: Eckstarttermin liegt nach terminiertem Starttermin |
077 | D | Gesamtnetzterm.: keine Konflikte zwischen Eckterminen und term.Terminen |
078 | D | PSP-Element &: Vorwärtsterminierung ohne Starttermin nicht möglich |
079 | D | PSP-Element &: Rückwärtsterminierung ohne Endtermin nicht möglich |
080 | D | Programm CX_TCX00 erfolgreich durchgeführt |
081 | D | Programm CX_TCX00 mit Warnung durchgeführt |
082 | D | Zeiteinheiten kleiner und größer/gleich Tag vorhanden |
083 | D | PSP-Element &1: Terminierter Start liegt vor dem Eckstarttermin |
084 | D | PSP-Element &1: Terminiertes Ende liegt nach dem Eckendtermin |
085 | D | Serienfertigung: Mittelpunktterminierung um Arbeitsplatz &1 nicht möglich |
086 | D | ermittelte Eigenfertigungszeit größer als 999 Tage |
090 | D | Einplanung: Mehrfachbelegung aufgrund von Einschränkungsterminen |
100 | D | **** Meldungen, die nicht ins Protokoll geschrieben werden |
101 | D | Vorwärtsterminierung (Bitte Starttermin eingeben) |
102 | D | Rückwärtsterminierung (Bitte Endtermin eingeben) |
103 | D | Keine Terminierung (Bitte Start- und Endtermin eingeben) |
104 | D | Starttermin darf nicht größer als Endtermin sein |
105 | D | Starttermin liegt in der Vergangenheit |
106 | D | Endtermin liegt in der Vergangenheit |
107 | D | Bitte geben Sie eine gültige Terminierungsart ein |
108 | D | Losgröße paßt nicht zum gewählten Losgrößenbereich |
109 | D | Eckendtermin liegt nach dem Bedarfstermin & |
110 | D | Rahmenendtermin liegt nach dem Bedarfstermin & |
111 | D | Bitte prüfen, ob mehrere Planungsebenen sinnvoll -> Langtext beachten |
112 | D | Beziehungswissen zu kompliziert. Arbeitsplan & , Folge & , Vorgang & |
118 | D | Terminierung ist noch nicht ausgeführt |
119 | D | Terminierungsprotokoll enthält keine Einträge |
120 | D | Rahmenendtermin konnte nicht eingehalten werden |
121 | D | Rahmenstarttermin konnte nicht eingehalten werden |
130 | D | ********* Meldungen für X-Messages ************************************** |
131 | D | Status-Objekt &1 des Vorgangs &2 zu Auftrag &3 ist ungültig |
132 | D | Fehler beim Erzeugen der internen Tabelle Vorgang zu Auftragsnummer &1 |
133 | D | Abbruch der Terminierung: ungültiger Terminierungszeitpunkt |
134 | D | Fehler beim Erzeugen der internen Tabelle Auftrag zu Auftragsnummer &1 |
135 | D | Fehler beim Lesen der internen Tabelle Vorgang |
136 | D | Fehler beim Lesen der internen Tabelle Auftrag |
137 | D | Selektionsbedingungen für Kapazitäten nicht erlaubt |
138 | D | Falscher Zugriff auf Kapazitätsbelegtabelle bei Verfügbarkeitsprüfung |
139 | D | Schlüsselfeld für Vorgang im Kapazitätsbedarfssatz KBED falsch |
141 | D | Fehler beim Lesen von Kapazitäten mit Versionsnummer |
142 | D | Fehler beim Lesen von Kapazitäten mit Splits |
144 | D | PSP-Element/Projektterminierung: Termin ist initial |
145 | D | Termine im Prognoseterminkreis nicht vorhanden |
146 | D | Kein Vorgang zur Terminierung vorhanden |
000 | E | . |
001 | E | Scheduling terminated: Check date and scheduling type |
002 | E | Scheduling terminated: Check lot size unit of measure |
003 | E | Scheduling terminated: Check lot size unit of measure |
004 | E | No work center in the op./act. (working/operat.time via cal.in op./act.) |
005 | E | All standard values not maintained in the operation |
006 | E | No dates found for restrictions |
007 | E | Date for restriction could not be converted |
008 | E | Date is not defined in factory calendar |
009 | E | PRT: Finish date is before start date, finish date - start date |
010 | E | Sub-op.: Finish date is before start date, finish date - start date |
011 | E | Order: Finish dat is before start date, finish date - start date |
012 | E | Scheduling terminated: No time unit defined for day |
013 | E | Time units are not fully defined |
014 | E | No working/operating time maintained in work center for scheduling |
015 | E | No capacity category maintained in work center for scheduling |
016 | E | Calender not found |
017 | E | No calendar specified |
018 | E | Work center not found |
019 | E | Entry not found in move time matrix |
020 | E | Field overflow when calculating PRT quantities |
021 | E | Field overflow when calculating PRT usage values |
022 | E | Date cannot be converted into the internal format |
023 | E | Error when converting into other quantity units |
024 | E | Field overflow when calculating duration |
025 | E | Scheduled start is after scheduled finish |
026 | E | Scheduling type not defined, scheduling type - 'only capacity reqmts' |
027 | E | Quantity unit of the operation/activity is invalid |
028 | E | No work center or calender in operation/activity |
029 | E | No release period key defined for scheduling |
030 | E | Start date is in the past: today scheduling |
031 | E | Control key & not found |
032 | E | Scheduling terminated: Scheduling parameters are missing |
033 | E | Constraint is before basic start date |
034 | E | Constraint is after basic finish date |
035 | E | Scheduled start is before basic start date |
036 | E | Scheduled finish is after basic finish date |
037 | E | Schedule conflict: Constraint is too early |
038 | E | Schedule conflict: Constraint is too late |
039 | E | Cannot keep within time constraint |
040 | E | Schedule conflict: Contradicting time constraints |
041 | E | No work center in the relationship (Operating time via calender from rel) |
042 | E | Relationship: No operating time maintained in work center for scheduling |
043 | E | Rel: No capacity category maintained in work center for scheduling |
044 | E | Relationship: Calendar does not exist |
045 | E | Relationship: No calendar specified |
046 | E | Rel: Work center does not exist |
047 | E | Rel: Field overflow when calculating the time interval |
048 | E | Rel: Date is not defined in factory calendar |
049 | E | Rel: Date cannot be converted into the internal format |
050 | E | Rel: Error when converting into different quantity unit |
051 | E | Operating time not maintained for move in the move time matrix |
052 | E | Milestone &2: Date is not within the dates for activity &1 |
053 | E | Field overflow when calculating quantity |
054 | E | WBS date could not be converted |
055 | E | Division by 0 when calculating operation quantity |
056 | E | Capacity & not available |
057 | E | No valid capacity for finite scheduling |
058 | E | Relationships to other standard networks exist |
059 | E | Detailed scheduling level - Order & |
060 | E | Rate-based scheduling level - Order & |
061 | E | Rough-cut scheduling level - Order & |
062 | E | ------------------------------------------------------------------------- |
063 | E | Overlapping could not be maintained |
064 | E | Minimum overlap time could not be maintained |
065 | E | Order & is completely confirmed. Order basic dates unchanged |
066 | E | Error during scheduling of splits |
067 | E | Not all standard values maintained |
068 | E | Can delivery date for material & be kept? Realistic date: & |
069 | E | PRT: no master record found |
070 | E | Relationship: Maximum duration could not be kept |
071 | E | Operation has been scheduled |
072 | E | After scheduling: Order starts in the past |
073 | E | Milestone &2: Date is not within the dates for WBS element &1 |
074 | E | Dates are set by external system |
075 | E | Overall network scheduling: Basic finish date before scheduled finish |
076 | E | Overall network scheduling: Basic start is after scheduled start |
077 | E | Overall netw. sched.: No conflicts between basic and scheduled dates |
078 | E | WBS element &: Forwards scheduling is not possible without a start date |
079 | E | WBS element &: Backwards scheduling is not possible without a finish date |
080 | E | Program CX_TCX00 executed successfully |
081 | E | Program CX_TCX00 executed with a warning |
082 | E | Time units exist that are smaller and larger/equal to the day |
083 | E | WBS element &1: Scheduled start comes before the basic start date |
084 | E | WBS element &1: Scheduled finish comes after the basic finish date |
085 | E | Repetitive maufacturing: Midpoint sched. around work center &1 not poss. |
086 | E | In-house production time determined is greater than 999 days |
090 | E | Scheduling: Multiple commitment due to constraint dates |
100 | E | **** Messages which are not written into the log |
101 | E | Forward scheduling (enter start date) |
102 | E | Backward scheduling (enter finish date) |
103 | E | Capacity requirements calc. (enter start and finish date) |
104 | E | Start date must not be later than finish date |
105 | E | Start date is in the past |
106 | E | Finish date is in the past |
107 | E | Enter a valid scheduling type |
108 | E | Lot size is not within selected lot size range |
109 | E | Basic finish date is after requirements date & |
110 | E | Outline finish date is after requirements date & |
111 | E | Check if rate-based scheduling is appropriate -> see long text |
112 | E | Obj. dependencies too complicated (Routing &1, sequence &2, operation &3) |
118 | E | Scheduling has not yet been carried out |
119 | E | Scheduling log does not contain any entries |
120 | E | Outline finish date could not be kept |
121 | E | Outline start date could not be kept |
130 | E | ********* Texts for X messsages ***************************************** |
131 | E | Status object &1 in operation &2 order &3 is invalid |
132 | E | Error while creating internal table operation for order number & |
133 | E | Scheduling termination: Invalid scheduling time |
134 | E | Error while creating internal table Order for order number &1 |
135 | E | Error while reading internal table Operation |
136 | E | Error whiel reading internal table Order |
137 | E | Selection criteria not allowed for capacities |
138 | E | Incorrect access to the capacity document table during availability check |
139 | E | Key field for operation in capacity requirements record KBED incorrect |
140 | E | Error during scheduling of splits |
141 | E | Error while reading capacities with version numbers |
142 | E | error while reading capacities with splits |
144 | E | WBS element/project scheduling: No date has been entered |
145 | E | Dates do not exist in the forecast dates |
146 | E | No operation exists for scheduling |
087 | E | Difference of & & transferred to statistical CoID & |
088 | E | Item no. is blank in line & |
089 | E | A program error occurred (no item specified) |
091 | E | Remove last line of data entry form |
092 | E | Error during delete in totals records file |
093 | E | & & breakdown not possible with entry by accouting period |
094 | E | Data entry on totals items is not allowed >> |
095 | E | Data input for corporate values already blocked |
096 | E | Data input for local values already blocked |
098 | E | Input for data entry form & blocked |
099 | E | You have no authorization for data entry form & |