This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table TCX00 (Scheduling: Planning Levels and Control Parameters) is a standard table in SAP ERP. It belongs to the package CX.
Table | TCX00 |
Short Text | Scheduling: Planning Levels and Control Parameters |
Package | CX |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
AUFTG | ✔ | Order group for capacity planning | AUFTG | CHAR | 2 | |
AUFTA | ✔ | Order type in capacity planning | AUFTA | CHAR | 4 | |
VAGRP | ✔ | Production Supervisor | FEVOR | CHAR | 3 | T024F |
PHORI | Scheduling horizon (detailed planning) | PHORI | NUMC | 3 | ||
APLS1 | Selection ID (detailed planning) | APLS1 | CHAR | 2 | TCA43 | |
TERM1 | Lead time scheduling (detailed planning) | TERMX | CHAR | 1 | ||
KAPK1 | Indicator: Generate capacity reqmts (detailed planning) | KAPKX | CHAR | 1 | ||
PHORI_2 | Scheduling horizon (detailed planning, medium term) | PHORI_2 | NUMC | 3 | ||
APLS1_2 | Selection ID for routing (detailed planning, medium term) | APLS1_2 | CHAR | 2 | * | |
TERM1_2 | Lead time scheduling (detailed planning, medium term) | TERMX_2 | CHAR | 1 | ||
KAPK1_2 | Create capacity requirements (detailed planning,medium term) | KAPKX_2 | CHAR | 1 | ||
PHORI_3 | Scheduling horizon (detailed planning, long term) | PHORI_3 | NUMC | 3 | ||
APLS1_3 | Selection ID for routing (detailed planning, long term) | APLS1_3 | CHAR | 2 | * | |
KAPK1_3 | Create capacity requirements (detailed planning, long term) | KAPKX_3 | CHAR | 1 | ||
TERM1_3 | Lead time scheduling (detailed planning, long term) | TERMX_3 | CHAR | 1 | ||
LINE_TERM | Takt time-/rate-based scheduling of planned order | LINE_TERM | CHAR | 1 | ||
RATHR | Rate-based planning horizon | RATHR | NUMC | 3 | ||
APLS2 | Selection ID (rate-based planning) | APLS2 | CHAR | 2 | TCA43 | |
TERM2 | Lead time scheduling (rate-based planning) | TERMX_RATE | CHAR | 1 | ||
KAPK2 | Create capacity requirements (rate-based planning) | KAPKX_RATE | CHAR | 1 | ||
GROHR | Rough-cut planning horizon | GROHR | NUMC | 3 | ||
APLS3 | Selection ID (rough-cut planning) | APLS3 | CHAR | 2 | TCA43 | |
TERM3 | Lead time scheduling (rough-cut planning) | TERMX_GROB | CHAR | 1 | ||
KAPK3 | Create capacity requirements (rough-cut planning) | KAPKX_GROB | CHAR | 1 | ||
DADJ1 | Scheduling level for adjusting basic dates | DADJ1 | CHAR | 1 | ||
DADJ2 | Adjust dates in lead time scheduling | DADJ2 | CHAR | 1 | ||
DADJ3 | Adjusting dates when dispatching planned orders | DADJ3 | CHAR | 1 | ||
TERMKZ | Scheduling type | TERMKZ | CHAR | 1 | T482 | |
TERM_AUTO | Indicator: Calculate dates automatically during saving | TERM_AUTO | CHAR | 1 | ||
PROT_AUTO | Display scheduling log automatically | PROT_AUTO | CHAR | 1 | ||
STVERG | Maximum number of days start date can be in the past | STVERG | NUMC | 3 | ||
MATFRUEH | Latest date for material staging | LAGE_FR | CHAR | 1 | ||
BREAKS | Indicator: Scheduling allowing for breaks | BREAKS | CHAR | 1 | ||
PROD_DATES | Scheduling based on production dates | PROD_DATES | CHAR | 1 | ||
AUF_SHIFT | Indicator: Shift order/network | AUF_SHIFT | CHAR | 1 | ||
REDST_MAX | Maximum reduction level | REDST_MAX | NUMC | 1 | ||
RED_ART | Reduction type | RED_ART | CHAR | 1 | ||
REDVS_S1 | Red. of floats before and after production (%) | REDVS_S1 | DEC | 3 | ||
REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | REDVS_S2 | DEC | 3 | ||
REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | REDVS_S3 | DEC | 3 | ||
REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | REDVS_S4 | DEC | 3 | ||
REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | REDVS_S5 | DEC | 3 | ||
REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | REDVS_S6 | DEC | 3 | ||
TERM_KPER | Rescheduling in Workforce Planning | TERM_KPER | CHAR | 1 | ||
CMACT | Assignment Material Staging Operation Segment | CMACT | CHAR | 1 |