This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table TCY08 (Option profiles) is a standard table in SAP ERP. It belongs to the package CY.
Table | TCY08 |
Short Text | Option profiles |
Package | CY |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
DARPROF_ID | ✔ | ID of a user-spec. profile in the table for option profiles | DARPROF_ID | CHAR | 10 | |
HIEVER | Cumulate capacity requirements using work center hierarchy | HIEVER | CHAR | 1 | ||
HIEAUF | Explode hierarchy | HIEAUF | CHAR | 1 | ||
KUMUL | Indicator, whether cumulated display is desired | KUMULD | CHAR | 1 | ||
MINBEL | Minimum load that will be displayed | MINBELA | DEC | 3 | ||
MAXBEL | Maximum load that will be displayed | MAXBELA | DEC | 3 | ||
RUECKDAT | Offset (in days) of dispatch date for backlog to curr. date | RDATUM_CNT | DEC | 5 | ||
PEINHEIT | Unit in which the period duration is specified (day, week..) | DAPER | CHAR | 1 | ||
PDAUER | Duration of a period (units as specified in period type) | DAPED | DEC | 3 | ||
LIBART | Requirements category (scheduled or remaining) | CY_SBART | CHAR | 1 | ||
ZAPER | Type of date specification | CY_ZAPER | CHAR | 1 | ||
LIDAVCNT | Offset (in days) of start date for lists to current date | CY_DCNTV | DEC | 5 | ||
LIDABCNT | Offset (in days) of end date for lists to current date | CY_DCNTB | DEC | 5 | ||
LIEINH | Unit of of measure for displaying capacity requirements | CY_KEINH | UNIT | 3 | T006 | |
DAVAP | Distribution according to key in work center or operation | DAVAP | CHAR | 1 | ||
HNAME | Name of hierarchy | CR_HNAME | CHAR | 10 | ||
HWERKS | Plant | WERKS_D | CHAR | 4 | T001W | |
VERTL1 | Distribution of capacity requirements (Planned/prod.order) | CR_VERTL | CHAR | 8 | TC29 | |
VERTLN | Distr.cap.reqmts (plant maint.,process order, network) | CR_VERTLN | CHAR | 8 | TC29 | |
POOLKAP | Indicator: Cumulated view of the rqmts of pooled capacity | CY_POOLKAP | CHAR | 1 | ||
TT_FAUFT | Indicator: Branch to production order - change or display | CY_TTFAUFT | CHAR | 1 | ||
TT_PAUFT | Indicator: Branch to planned order display or maintenance | CY_TTPAUFT | CHAR | 1 | ||
TT_ARBPL | Switch: Branch to work center - change or display | CY_TTARBPL | CHAR | 1 | ||
ANVER | Cumulate available capacity using work center hierarchy | CY_ANVER | CHAR | 1 | ||
DATEFROM | Start date for output of capacity evaluations | CY_DATEF | CHAR | 10 | ||
DATETO | Finish date for output of capacity evaluations | CY_DATET | CHAR | 10 | ||
RDATE_TYPE | Type of date specification | CY_RDATETY | CHAR | 1 | ||
RDATE | Date of backlog dispatching | CY_RDATE | CHAR | 10 | ||
MRPP | PPC planning calendar | MRPPP | CHAR | 3 | T439G | |
UNITSOURCE | Origin of unit of measure for available cap. and cap.reqmts | CY_UNITSRC | CHAR | 1 | ||
PPSWERK | Plant | WERKS_D | CHAR | 4 | T001W |