SAP Table VSPROJ_CN

Version: Project definition

Recommended Now

Fire TV Stick Lite Essentials Bundle

This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.

Check it out on amazon.com →

The table VSPROJ_CN (Version: Project definition) is a standard table in SAP ERP. It belongs to the package CNVS.

Technical Information

Table VSPROJ_CN
Short Text Version: Project definition
Package CNVS
Table Type Transparent Table

Fields for Table VSPROJ_CN

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
VSNMR Number or description of a version VSNMR CHAR 12
PSPNR Project definition (internal) PS_INTNR NUMC 8 *
PSPID Project Definition PS_PSPID CHAR 24
POST1 PS: Short description (1st text line) PS_POST1 CHAR 40
OBJNR Object number J_OBJNR CHAR 22 ONR00
ERNAM Name of Person who Created the Object ERNAM CHAR 12
ERDAT Date on Which Record Was Created ERDAT DATS 8
AENAM Name of Person Who Changed Object AENAM CHAR 12
AEDAT Date on which object was last changed UPDAT DATS 8
KIMSK Selection mask for WBS element short IDs PS_KIMSK CHAR 24
AUTOD Automatic value transfer from WBS element to project def. PS_AUTOD CHAR 1
STSPD Status profile for project definition PS_STSPD CHAR 8 TJ20
STSPR Status profile for WBS element PS_STSPR CHAR 8 TJ20
VERNR Number of the responsible person (project manager) PS_VERNR NUMC 8 TCJ04
VERNA Name of responsible person (Project manager) PS_VERNA CHAR 25
ASTNR Applicant number PS_ASTNR NUMC 8 TCJ05
ASTNA Applicant PS_ASTNA CHAR 25
VBUKR Company code for the project PS_VBUKR CHAR 4 T001
VGSBR Business area for the project PS_VGSBR CHAR 4 TGSB
VKOKR Controlling area for the project PS_VKOKR CHAR 4 TKA01
PRCTR Profit Center PRCTR CHAR 10 CEPC
PWHIE WBS currency (project definition) PS_PWHIE CUKY 5 TCURC
ZUORD Network assignment PS_ZUORD NUMC 1
TRMEQ Indicator: WBS dates detailed by activity dates PS_TRMEQ CHAR 1
PLFAZ Project planned start date PS_PLFAZ DATS 8
PLSEZ Project planned finish date PS_PLSEZ DATS 8
WERKS Plant WERKS_D CHAR 4 T001W
KALID Factory calendar key FABKL CHAR 2 TFACD
VGPLF Planning method for project basic dates PS_VGPLF NUMC 1
EWPLF Planning method for project forecast dates PS_EWPLF NUMC 1
ZTEHT Time unit in time scheduling PS_ZTEHT UNIT 3 T006
NZANZ Indicator: Network header visible to end user NETZOBERFL CHAR 1
PLNAW Application of the task list PLNAW CHAR 1 TCA09
VPROF Network profile PROFIDNZPL CHAR 7 TCN41
PROFL Project Profile PROFIDPROJ CHAR 7 TCJ41
BPROF Budget Profile BP_BPROFIL CHAR 6 TBP1C
TXTSP Language Key SPRAS LANG 1 T002
KOSTL Cost Center KOSTL CHAR 10 CSKS
KTRG Cost Object KSTRG CHAR 12 CKPH
AEDTE Date of last scheduling of the overall network (basic dates) PS_AEDTE DATS 8
AEDTP Date of last scheduling of the overall network (forecast) PS_AEDTP DATS 8
BERST Authorization key for project master data PS_BERST CHAR 16
BERTR Authorization key for project dates (WBS) PS_BERTR CHAR 16
BERKO Authorization key for costs and revenues PS_BERKO CHAR 16
BERBU Authorization key for project budget PS_BERBU CHAR 16
SPSNR Current number for standard project PS_ISPSP NUMC 8 PROJS
BESTA Project stock PS_BESTAND CHAR 1
SCOPE Object Class SCOPE_CV CHAR 2
XSTAT Statistical WBS element PS_XSTAT CHAR 1
TXJCD Tax Jurisdiction TXJCD CHAR 15 TTXJ
ZSCHM Interest Profile for Project/Order Interest Calculation PS_ZSCHM CHAR 7 TPI01
SCPRF Profile for WBS scheduling PS_SCHDPRF CHAR 12 TCXPS
IMPRF Investment measure profile IM_PROFIL CHAR 6 TAPRF
FMPRF Payment plan profile PSFM_PRF CHAR 6 TBP1C
ABGSL Results Analysis Key ABGR_SCHL CHAR 6 TKKAA
POSTU PS: Short description (1st text line) in all caps PS_POSTU CHAR 40
PPROF Planning profile BP_PPROFIL CHAR 6 TBP1C
PLINT Indicator for Integrated Planning PLINT CHAR 1
LOEVM Deletion Indicator LOEVM CHAR 1
INACT Indicator: Project definition inactive PS_INACT CHAR 1
KZBWS Valuation of Special Stock KZBWS CHAR 1
SMPRF Simulation profile SIM_PROFIL CHAR 7 TCN54
FLGVRG Indicator: Bottom-up calculation with activity dates PS_FLGVRG CHAR 1
GRTOP Indicator: Automatic requirements grouping GRONTOP CHAR 1
PGPRF Distribution profile PGPROFID CHAR 6 TPGPRF
STORT Location PS_STORT CHAR 10 T499S
LOGSYSTEM Logical System LOGSYSTEM CHAR 10 *
KZERB Indicator: Project summarization via master data charact. PS_KZERB CHAR 1
PARGR Partner Determination Procedure PARGR CHAR 4 V_TVPG_S
FUNC_AREA Functional Area FKBER CHAR 16 TFKB
VKORG Sales Organization VKORG CHAR 4 TVKO
VTWEG Distribution Channel VTWEG CHAR 2 TVKOV
SPART Division SPART CHAR 2 TVTA
DPPPROF Dynamic Item Processor Profile AD01PROFNR CHAR 8 AD01C_PROF
VPKSTU Node level SEU_LEVEL NUMC 2
PSPID_EDIT Project Number (External) Edited PS_PSPID_EDIT CHAR 24
VNAME Joint Venture JV_NAME CHAR 6 T8JV
RECID Recovery Indicator JV_RECIND CHAR 2 T8JJ
ETYPE Equity type JV_ETYPE CHAR 3 T8JE
OTYPE Joint Venture Object Type JV_OTYPE CHAR 4
JIBCL JIB/JIBE Class JV_JIBCL CHAR 3 T8J6A
JIBSA JIB/JIBE Subclass A JV_JIBSA CHAR 5 T8J6C
ZFILEPATH Character field of length 40 CHAR40 CHAR 40
ZFILE1NAME Char 20 CHAR20 CHAR 20
ZFILE1EXTE 3-Byte field CHAR3 CHAR 3
ZFILE2NAME Char 20 CHAR20 CHAR 20
ZFILE2EXTE 3-Byte field CHAR3 CHAR 3
ZFILE3NAME Char 20 CHAR20 CHAR 20
ZFILE3EXTE 3-Byte field CHAR3 CHAR 3
SCHTYP Scheduling scenario PS_SCHED_TYPE CHAR 1
SPROG Forecast start date of project definition PS_SPROG DATS 8
EPROG Forecast finish date for project definition PS_EPROG DATS 8
ORGKEY Project definition (internal) PS_INTNR NUMC 8 *
INCAT Version inactive indicator VSINACT CHAR 1
PROJ_STATUS Status Combination ACTCMB_DELE INT1 3 ACTCMB_TAB
FERC_IND Regulatory indicator FE_IND CHAR 4 FERC_C7