Menu

SAP Table A077

Cost Split for Activities in Contract

Recommended Now

All-new Echo Dot Smart speaker with Alexa

This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.

Check it out on amazon.com →

The table A077 (Cost Split for Activities in Contract) is a standard table in SAP ERP. It belongs to the package VKON.

Technical Information

Table A077
Short Text Cost Split for Activities in Contract
Package VKON
Table Type Transparent Table

Fields for Table A077

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
KAPPL Application KAPPL CHAR 2 T681A
KSCHL Condition type KSCHA CHAR 4 T685
EKORG Purchasing Organization EKORG CHAR 4 T024E
PACKNO Package number PACKNO NUMC 10 ESLH
INTROW Internal line number for limits INTROW NUMC 10
DATBI Validity end date of the condition record KODATBI DATS 8
DATAB Validity start date of the condition record KODATAB DATS 8
KNUMH Condition record number KNUMH CHAR 10