This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table PLSC (Planning scenarios in long-term planning) is a standard table in SAP ERP. It belongs to the package MD03.
Table | PLSC |
Short Text | Planning scenarios in long-term planning |
Package | MD03 |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
PLSCN | ✔ | Planning Scenario of Long-Term Planning | PLSCN | NUMC | 3 | |
PSACT | Planning scenario status | PSACT | CHAR | 1 | ||
PLSCT | Planning scenario description | PLSCT | CHAR | 40 | ||
PDAT1 | Start of the planning period | PDAT1 | DATS | 8 | ||
PDAT2 | End of planning period | PDAT2 | DATS | 8 | ||
MDATE | Plng scenario: key date for chnge status of material master | MDATE | DATS | 8 | ||
SBFLG | Long-term plnng: depend.reqmts for reorder point materials | SBFLG | CHAR | 1 | ||
SSTCK | Opening stock for long-term planning | SSTCK | CHAR | 1 | ||
SSTFL | Long term planning: average plant stock compiled | SSTFL | CHAR | 1 | ||
VERSA | Active version of available capacity | KAPVERSAKT | NUMC | 2 | TC36 | |
FIXEL | Long-term planning: include firmed issues and receipts | FIXEL | CHAR | 1 | ||
VRSIO | Version number in the information structure | VRSIO | CHAR | 3 | P44V | |
EISDT | Date of last data transfer to the purchasing info system | EISDT | DATS | 8 | ||
VSBCO | Inventory controlling version | VRSIO_BCO | CHAR | 3 | P44V | |
BCODT | Date of last data transfer to inventory controlling | BCODT | DATS | 8 | ||
FIXLO | Long-term planning: switch off planning time fence | FIXLO | CHAR | 1 | ||
EINPL | Long-term planning: single-item planning in scenario on/off | EINPL | CHAR | 1 | ||
KDAKZ | Long-term planning: Consider sales orders? Yes/No | KDAKZ | CHAR | 1 | ||
FBAKZ | Long-term planning:include firm purchase requisitions yes/no | FBAKZ | CHAR | 1 | ||
FPAKZ | Long-term planning: Include firm planned orders yes/no | FPAFL | CHAR | 1 | ||
DIRKZ | Long-term planning: Use direct production | DIRKZ | CHAR | 1 | ||
AVMKZ | Long-term planning: Do not calculate scrap quantity | AVMKZ | CHAR | 1 | ||
LLSKZ | Long-term planning: Use gross lot size | LLSKZ | CHAR | 1 | ||
LTPLS | Long-term planning lot size procedure (gross) | LTPLS | CHAR | 2 | T439A | |
LTPID | Long-term planning: Selection ID for BOMs | LTPID | CHAR | 2 | TCS41 |