The package CC0C01 (Customizing R/3 PPS Engineering Change Mgmt: Extended Core) is a standard package in SAP ERP. It belongs to the parent package APPL.
Package | CC0C01 |
Short Text | Customizing R/3 PPS Engineering Change Mgmt: Extended Core |
Parent Package | APPL |
SAP Package CC0C01 contains 1 function groups.
0CC10 | ECM: History Requirement |
---|
SAP Package CC0C01 contains 5 views.
V_HIST_REQ_BOM | History Requirement Control: Bill of Material |
---|---|
V_HIST_REQ_BOMS | History Requirement Control per BOM Status |
V_HIST_REQ_DOC | History Requirement Control: Document |
V_HIST_REQ_DOCS | History Requirement Control per Document Status |
V_HIST_REQ_MAT | History Requirement Control: Material |
SAP Package CC0C01 contains 1 programs.
SAPMCC10 | ECM: Module Pool for VC_HISTORY_REQ |
---|