SAP Table KBEZ

Add. data for table KBED (for indiv. capacities/splits)

The table KBEZ (Add. data for table KBED (for indiv. capacities/splits)) is a standard table in SAP ERP. It belongs to the package CX.

Technical Information

Table KBEZ
Short Text Add. data for table KBED (for indiv. capacities/splits)
Package CX
Table Type Transparent Table

Fields for Table KBEZ

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
BEDID ID of the capacity requirements record BEDID NUMC 12 KBKO
BEDZL Internal counter CIM_COUNT NUMC 8
CANUM Counters for cap. rqmts. records (various caps. + indiv.caps CY_COUNT NUMC 4 KBED
VGW01 Standard Value VGWRT QUAN 9
VGE01 Unit of measure for the standard value VGWRTEH UNIT 3 T006
VGW02 Standard Value VGWRT QUAN 9
VGE02 Unit of measure for the standard value VGWRTEH UNIT 3 T006
VGW03 Standard Value VGWRT QUAN 9
VGE03 Unit of measure for the standard value VGWRTEH UNIT 3 T006
VGW04 Standard Value VGWRT QUAN 9
VGE04 Unit of measure for the standard value VGWRTEH UNIT 3 T006
VGW05 Standard Value VGWRT QUAN 9
VGE05 Unit of measure for the standard value VGWRTEH UNIT 3 T006
VGW06 Standard Value VGWRT QUAN 9
VGE06 Unit of measure for the standard value VGWRTEH UNIT 3 T006
USR04 User field for quantity (length 10.3) USRQUAN13 QUAN 13
USE04 User field: Unit for quantity fields USRUNIT UNIT 3 T006
USR05 User field for quantity (length 10.3) USRQUAN13 QUAN 13
USE05 User field: Unit for quantity fields USRUNIT UNIT 3 T006
LEK01 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
LEK02 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
LEK03 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
LEK04 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
LEK05 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
LEK06 Indicator: No remaining activity expected CO_LEIKZ CHAR 1
RSTZE Unit of measure for setup time RSTZE UNIT 3
BEAZE Unit of measure for processing time BEAZE UNIT 3
ARUZE Unit of measure for teardown ARUZE UNIT 3
ARBEI Work involved in the activity ARBEIT QUAN 7
ARBEH Unit for work ARBEITE UNIT 3 T006
LEKNW Indicator: No remaining activity expected CO_LEIKZ CHAR 1
ASVRG Operation scrap ASVRG QUAN 13
UMREN Denominator for converting rtg and op units of measure CP_UMREN DEC 5
UMREZ Numerator for converting task list and oper. un. of measure CP_UMREZ DEC 5
BMSCH Base Quantity BMSCH QUAN 13
LMNGA Total Yield Confirmed LMNGA QUAN 13
XMNGA Total scrap quantity confirmed XMNGA QUAN 13
ISMNW Actual work CO_ISMNW QUAN 13
ISM01 Previously confirmed activity CO_RUMNG QUAN 13
ISM02 Previously confirmed activity CO_RUMNG QUAN 13
ISM03 Previously confirmed activity CO_RUMNG QUAN 13
ISM04 Previously confirmed activity CO_RUMNG QUAN 13
ISM05 Previously confirmed activity CO_RUMNG QUAN 13
ISM06 Previously confirmed activity CO_RUMNG QUAN 13
ISERH Confirmed break time ISERH QUAN 9
ZEIER Unit for the break time DZEIER UNIT 3 T006
ISDD Actual start: Execution (date) ISDD DATS 8
ISDZ Actual start: Execution/setup (time) ISDZ TIMS 6
IERD Actual finish: Setup (date) IERD DATS 8
IERZ Actual finish: Setup (time) IERZ TIMS 6
ISBD Actual start: Processing (date) ISBD DATS 8
ISBZ Actual start: Processing (time) ISBZ TIMS 6
IEBD Actual finish: Processing (date) IEBD DATS 8
IEBZ Actual processing finish (time) IEBZ TIMS 6
ISAD Actual start: Teardown (date) ISAD DATS 8
ISAZ Actual start: Teardown (time) ISAZ TIMS 6
IEDD Actual finish: Execution (date) IEDD DATS 8
IEDZ Actual finish: Execution (time) IEDZ TIMS 6
PEDD Forecast finish date of operation from confirmation CO_PEDD DATS 8
PEDZ Forecast finish time of operation from confirmation CO_PEDZ TIMS 6
OFM01 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFM02 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFM03 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFM04 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFM05 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFM06 Forecast value used to update the standard value CO_SCHAETZ QUAN 9
OFMNW Forecasted work (actual + remaining) OFMNW QUAN 7
PDAU Forecasted duration of activity from confirmation PDAU QUAN 5
PDAE Unit of the forecasted duration from the confirmation PDAE UNIT 3 T006
DAUNO Normal duration of the activity DAUNOR QUAN 5
DAUNE Normal duration/unit DAUNORE UNIT 3 T006
RMNGA Total confirmed rework quantity RMNGA QUAN 13
ILE01 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
ILE02 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
ILE03 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
ILE04 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
ILE05 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
ILE06 Unit of measure for the activity to be confirmed CO_ISMNGEH UNIT 3 T006
PER_EX Entry in KPER exists for this split CY_PEREX CHAR 1
DELTA_ST Time Difference Between Start Capacity and Individ. Capacity CY_DELTAST QUAN 13
DELTA_EN Time Difference Between Fin. Capacity and Individ. Capacity CY_DELTAEN QUAN 13