MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
* |
WERKS |
✔ |
Plant |
WERKS_D |
CHAR |
4 |
T001W |
FIXPA |
|
Indicator: take firmed planned orders into account |
FIXPA |
CHAR |
1 |
|
FIXBA |
|
Indicator: take firmed purchase requisitions into account |
FIXBA |
CHAR |
1 |
|
FIXBE |
|
Ind: take firmed order item/schedule line into account |
FIXBE |
CHAR |
1 |
|
UMTHZ |
|
Rescheduling horizon |
UMTHZ |
NUMC |
3 |
|
VWVOR |
|
Tolerance value for bringing forward receipt elements |
VWVOR |
NUMC |
2 |
|
VWVER |
|
Tolerance value for displacement in the future |
VWVER |
NUMC |
2 |
|
PLAHZ |
|
Planning horizon |
PLAHZ |
NUMC |
3 |
|
NKPAF |
|
Number range for planned orders |
NKPAF |
CHAR |
2 |
|
NKBAN |
|
Number range for purchase requisitions |
NKBAN |
CHAR |
2 |
|
PSBAN |
|
Item number of purchase requisition |
PSBAN |
NUMC |
5 |
* |
NKDIS |
|
Number range for MRP lists |
NKDIS |
CHAR |
2 |
|
NKRES |
|
Number range for stock transfer reservations |
NKRES |
CHAR |
2 |
|
PSRES |
|
Item number of the stock transfer reservation |
PSRES |
NUMC |
4 |
|
BZTEK |
|
Processing time required by purchasing department |
BZTEK |
NUMC |
2 |
|
EREKG |
|
Substitute purchasing group for requirements planning |
EREKG |
CHAR |
3 |
T024 |
ERDSG |
|
Substitute MRP contoller/group for requirements planning |
ERDSG |
CHAR |
3 |
T024D |
MXBST |
|
Maximum Number of Purchase Order Proposals per Date |
MXBST |
NUMC |
3 |
|
MXPLA |
|
Number of planned orders to be read |
MXPLA |
NUMC |
3 |
|
ANZLS |
|
Display material list |
ANZLS |
CHAR |
1 |
|
MXSTA |
|
Runtime statistics: frequency of reporting |
MXSTA |
NUMC |
3 |
|
CSLID |
|
Selection ID for the BOM |
STLID |
CHAR |
2 |
TCS41 |
KTAGE |
|
Period grouping according to days |
KTAGE |
CHAR |
1 |
|
KWOCH |
|
Period grouping according to weeks |
KWOCH |
CHAR |
1 |
|
KMONA |
|
Period grouping according to months |
KMONA |
CHAR |
1 |
|
KFLPR |
|
Period grouping according to posting periods |
KFLPR |
CHAR |
1 |
|
KMRPP |
|
Period grouping according to planning calendar |
KMRPP |
CHAR |
1 |
|
MRRPP |
|
PPC planning calendar |
MRPPP |
CHAR |
3 |
T439G |
KRAST |
|
Period grouping according to individual split |
KRAST |
CHAR |
1 |
|
PRAST |
|
Period split |
PRAST |
CHAR |
5 |
T449A |
FIXFA |
|
Indicator: take production orders into account |
FIXFA |
CHAR |
1 |
|
APLSL |
|
Selection ID for routing alternatives |
APLSL |
CHAR |
2 |
* |
LIFKZ |
|
Automatic Schedule Lines (Scheduling Agreements) |
LIFKZ |
CHAR |
1 |
|
GTERM |
|
Scheduling according to purchasing info record or agreement |
GTERM |
CHAR |
1 |
|
KZDRB |
|
Indicator: direct procurement/production MRP |
KZDRB |
CHAR |
1 |
|
KNTBE |
|
Account assig.type: account for sales order, no special stck |
KNTBE_D |
CHAR |
1 |
T163K |
KNTBU |
|
Account assignment category: unknown account assignment |
KNTBU |
CHAR |
1 |
T163K |
KTDBU |
|
Accnt asgnmt cat. for direct procuremt: unknown accnt asgnmt |
KTDBU |
CHAR |
1 |
T163K |
KZMAL |
|
Indicator: message desired |
KZMAL |
CHAR |
1 |
|
KZUMB |
|
Indicator: stock in transfer available for planning |
KZUMB |
CHAR |
1 |
|
FIXQM |
|
Quality management inspection lot can be given priority |
FIXQM |
CHAR |
1 |
|
XFAN1 |
|
Indicator: blocked stock available for planning |
XFAN1 |
CHAR |
1 |
|
XFAN2 |
|
AccAssgtCat: acc. assgt according to project, no special stk |
XFAN2 |
CHAR |
1 |
T163K |
XFAN3 |
|
Do not initiate the extended purch.ord. rel. strategy search |
XFAN3 |
CHAR |
1 |
|
PRREG |
|
Checking Rule for Availability Check |
PRREG |
CHAR |
2 |
T441R |
AUART |
|
Order Type |
AUFART |
CHAR |
4 |
T003O |
FIXLA |
|
Indicator: take shipping notification into account |
FIXLA |
CHAR |
1 |
|
RPRRG |
|
Checking Rule for Availability Check |
PRREG |
CHAR |
2 |
T441R |
FEDIS |
|
MRP Controller (Materials Planner) |
DISPO |
CHAR |
3 |
T024D |
REFWK |
|
Reference plant |
REFWK |
CHAR |
4 |
T001W |
SIMPL |
|
Long-term planning allowed for a plant |
SIMPL |
CHAR |
1 |
|
SELFE |
|
Selection of production orders / process orders |
SELFA |
CHAR |
1 |
|
SELBE |
|
Sel.of POs, shpg notifications, sched. lines, dely scheds |
SELBE |
CHAR |
1 |
|
SELQM |
|
Selection of QM inspection lots |
SELQM |
CHAR |
1 |
|
SELBA |
|
Selection of firmed purchase requisitions |
SELBA |
CHAR |
1 |
|
SELPA |
|
Selection of firmed planned orders |
SELPL |
CHAR |
1 |
|
SELZR |
|
Selection of receipt reservations |
SELZR |
CHAR |
1 |
|
NKSBD |
|
Number range for simulative dependent requirements |
NKSBD |
CHAR |
2 |
|
VERTR |
|
Start date of order proposals allowed in the past |
VERTR |
CHAR |
1 |
|
AUAR2 |
|
Order type for process order |
AUAR2 |
CHAR |
4 |
T003O |
NKSAF |
|
Number range of simulative planned order |
NKSAF |
CHAR |
2 |
|
WAKHZ |
|
Period for the promotion |
WAKHZ |
NUMC |
3 |
|
EXSGT |
|
Do Not Explode Bulk Material Items |
EXSGT |
CHAR |
1 |
|
BESAL |
|
Determine Explosion Date for BOM and Routing |
BESAL |
CHAR |
1 |
|
KASTL |
|
Procedure with sales order BOM/WBS BOM active |
KASTL |
CHAR |
1 |
|
NKCRQ |
|
Number range for total requirements |
NKCRQ |
CHAR |
2 |
|
SEREP |
|
BOM explosion number make-to-order/engineer-to-order prod. |
SEREP |
CHAR |
1 |
|
IKDPL |
|
Index sales order/planned order |
IKDPL |
CHAR |
1 |
|
SELSB |
|
Range of coverage including/excluding safety stock |
SELSB |
CHAR |
1 |
|
NFVBC |
|
Take restricted-use stock into account (only for batches) |
NFVBC |
CHAR |
1 |
|
COMPM |
|
Transparent storage: MRP lists |
DECOMPX |
CHAR |
1 |
|
DBEPL |
|
Activate MRP areas at plant level |
DBEPL |
CHAR |
1 |
|
SELPZ |
|
Selection of assigned planned orders |
SELPZ |
CHAR |
1 |
|
SELLA |
|
Selection of shipping notifications |
SELLA |
CHAR |
1 |
|
SBUFF |
|
BOM Buffering in Shared Buffer |
MD_SBUFF |
CHAR |
1 |
|
SELIW |
|
Matl ROC incl. dely note with status 'In Plant' |
SELIW |
CHAR |
1 |
|
DSADA |
|
Generate serial number from APO for requirements? |
DSADA |
CHAR |
1 |
|
EVAPR |
|
Evaluation Profile for Range-of-Coverage Data |
MD_EVAPR |
CHAR |
3 |
T465 |