MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
WERKS |
✔ |
Plant |
WERKS_D |
CHAR |
4 |
T001W |
MTART |
✔ |
MRP Group |
DISGR |
CHAR |
4 |
|
BANER |
|
Creation Indicator for Purchase Requisitions |
BANER |
CHAR |
1 |
|
DISER |
|
Creation Indicator for MRP Lists |
DISER |
CHAR |
1 |
|
UMTHZ |
|
Rescheduling horizon |
UMTHZ |
NUMC |
3 |
|
FIXHZ |
|
Planning time fence |
FIXHZ |
NUMC |
3 |
|
PLAHZ |
|
Planning horizon |
PLAHZ |
NUMC |
3 |
|
SBDIS |
|
Share of safety stock which can be used for planning |
SBDIS |
NUMC |
3 |
|
LIFKZ |
|
Automatic Schedule Lines (Scheduling Agreements) |
LIFKZ |
CHAR |
1 |
|
GTERM |
|
Scheduling according to purchasing info record or agreement |
GTERM |
CHAR |
1 |
|
KZDRB |
|
Indicator: direct procurement/production MRP |
KZDRB |
CHAR |
1 |
|
XFAT1 |
|
Firm Only Schedule Lines Transmitted to Vendor by Purchasing |
XFAT1 |
CHAR |
1 |
|
XFAT2 |
|
Fant. 2 |
XFAT2 |
CHAR |
1 |
|
VWVOR |
|
Tolerance value for bringing forward receipt elements |
VWVOR |
NUMC |
2 |
|
VWVER |
|
Tolerance value for displacement in the future |
VWVER |
NUMC |
2 |
|
PRREG |
|
Checking Rule for Availability Check |
PRREG |
CHAR |
2 |
T441R |
VRMOD |
|
Consumption mode |
VRMOD |
CHAR |
1 |
|
VINT1 |
|
Consumption period: backward |
VINT1 |
NUMC |
3 |
|
VINT2 |
|
Consumption period: forward |
VINT2 |
NUMC |
3 |
|
STRGR |
|
Planning strategy group |
STRGR |
CHAR |
2 |
T461P |
RESHZ |
|
Roll forward period for the master plan |
RESHZ |
DEC |
2 |
|
ANDIS |
|
Number of Days After Which the Material Must Be Planned |
ANDIS |
INT2 |
5 |
|
AUART |
|
Order Type |
AUFART |
CHAR |
4 |
T003O |
AUAR2 |
|
Order type for process order |
AUAR2 |
CHAR |
4 |
T003O |
PLSEL |
|
Issue Storage Location Selection |
PLSEL |
CHAR |
1 |
|
RVPKZ |
|
Adjustment of Planned Independent Requirements |
RVPKZ |
CHAR |
1 |
|
RESVP |
|
Period of adjustment for planned independent requirements |
RESVP |
DEC |
3 |
|
SHFLG |
|
Safety time indicator (with or without safety time) |
SHFLG |
CHAR |
1 |
|
SHZET |
|
Safety time (in workdays) |
SHZET |
NUMC |
2 |
|
MDACH |
|
Action control: planned order processing |
MDACH |
CHAR |
2 |
T46AC |
PRASTA |
|
Period split |
PRASTA |
CHAR |
5 |
T459S |
EXSGT |
|
Do not explode bulk material items |
EXSGD |
CHAR |
1 |
|
BESAL |
|
Determination of explosion date for BOM and routing |
BESAD |
CHAR |
1 |
|
BSART |
|
MRP:doc.type purchase requisitions for standard purchase ord |
BBSRT_NB |
CHAR |
4 |
T161 |
BARTL |
|
MRP: Document type purchase requisition for subcontracting |
BBSRT_LB |
CHAR |
4 |
T161 |
BARTU |
|
MRP: purchase requisition for stock transfer - document type |
BBSRT_UL |
CHAR |
4 |
T161 |
GRREL |
|
Relevant for requirements grouping for project stock |
GRREL |
CHAR |
1 |
|
VERTR |
|
Start date of order proposals allowed in the past |
VERGR |
CHAR |
1 |
|
FKOBS |
|
ATP check by full confirmation logic |
FKOBS |
CHAR |
1 |
|
EVAPR |
|
Evaluation Profile for Range-of-Coverage Data |
MD_EVAPR |
CHAR |
3 |
T465 |