MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
WERKS |
✔ |
Plant |
WERKS_D |
CHAR |
4 |
T001W |
AUFTG |
✔ |
Order group for capacity planning |
AUFTG |
CHAR |
2 |
|
AUFTA |
✔ |
Order type in capacity planning |
AUFTA |
CHAR |
4 |
|
VAGRP |
✔ |
Production Supervisor |
FEVOR |
CHAR |
3 |
T024F |
PHORI |
|
Scheduling horizon (detailed planning) |
PHORI |
NUMC |
3 |
|
APLS1 |
|
Selection ID (detailed planning) |
APLS1 |
CHAR |
2 |
TCA43 |
TERM1 |
|
Lead time scheduling (detailed planning) |
TERMX |
CHAR |
1 |
|
KAPK1 |
|
Indicator: Generate capacity reqmts (detailed planning) |
KAPKX |
CHAR |
1 |
|
PHORI_2 |
|
Scheduling horizon (detailed planning, medium term) |
PHORI_2 |
NUMC |
3 |
|
APLS1_2 |
|
Selection ID for routing (detailed planning, medium term) |
APLS1_2 |
CHAR |
2 |
* |
TERM1_2 |
|
Lead time scheduling (detailed planning, medium term) |
TERMX_2 |
CHAR |
1 |
|
KAPK1_2 |
|
Create capacity requirements (detailed planning,medium term) |
KAPKX_2 |
CHAR |
1 |
|
PHORI_3 |
|
Scheduling horizon (detailed planning, long term) |
PHORI_3 |
NUMC |
3 |
|
APLS1_3 |
|
Selection ID for routing (detailed planning, long term) |
APLS1_3 |
CHAR |
2 |
* |
KAPK1_3 |
|
Create capacity requirements (detailed planning, long term) |
KAPKX_3 |
CHAR |
1 |
|
TERM1_3 |
|
Lead time scheduling (detailed planning, long term) |
TERMX_3 |
CHAR |
1 |
|
LINE_TERM |
|
Takt time-/rate-based scheduling of planned order |
LINE_TERM |
CHAR |
1 |
|
RATHR |
|
Rate-based planning horizon |
RATHR |
NUMC |
3 |
|
APLS2 |
|
Selection ID (rate-based planning) |
APLS2 |
CHAR |
2 |
TCA43 |
TERM2 |
|
Lead time scheduling (rate-based planning) |
TERMX_RATE |
CHAR |
1 |
|
KAPK2 |
|
Create capacity requirements (rate-based planning) |
KAPKX_RATE |
CHAR |
1 |
|
GROHR |
|
Rough-cut planning horizon |
GROHR |
NUMC |
3 |
|
APLS3 |
|
Selection ID (rough-cut planning) |
APLS3 |
CHAR |
2 |
TCA43 |
TERM3 |
|
Lead time scheduling (rough-cut planning) |
TERMX_GROB |
CHAR |
1 |
|
KAPK3 |
|
Create capacity requirements (rough-cut planning) |
KAPKX_GROB |
CHAR |
1 |
|
DADJ1 |
|
Scheduling level for adjusting basic dates |
DADJ1 |
CHAR |
1 |
|
DADJ2 |
|
Adjust dates in lead time scheduling |
DADJ2 |
CHAR |
1 |
|
DADJ3 |
|
Adjusting dates when dispatching planned orders |
DADJ3 |
CHAR |
1 |
|
TERMKZ |
|
Scheduling type |
TERMKZ |
CHAR |
1 |
T482 |
TERM_AUTO |
|
Indicator: Calculate dates automatically during saving |
TERM_AUTO |
CHAR |
1 |
|
PROT_AUTO |
|
Display scheduling log automatically |
PROT_AUTO |
CHAR |
1 |
|
STVERG |
|
Maximum number of days start date can be in the past |
STVERG |
NUMC |
3 |
|
MATFRUEH |
|
Latest date for material staging |
LAGE_FR |
CHAR |
1 |
|
BREAKS |
|
Indicator: Scheduling allowing for breaks |
BREAKS |
CHAR |
1 |
|
PROD_DATES |
|
Scheduling based on production dates |
PROD_DATES |
CHAR |
1 |
|
AUF_SHIFT |
|
Indicator: Shift order/network |
AUF_SHIFT |
CHAR |
1 |
|
REDST_MAX |
|
Maximum reduction level |
REDST_MAX |
NUMC |
1 |
|
RED_ART |
|
Reduction type |
RED_ART |
CHAR |
1 |
|
REDVS_S1 |
|
Red. of floats before and after production (%) |
REDVS_S1 |
DEC |
3 |
|
REDVS_S2 |
|
Reduction level 2: Red. of floats bef./after prod. (in %) |
REDVS_S2 |
DEC |
3 |
|
REDVS_S3 |
|
Reduction level 3: Red. of floats bef./aft. prod. (in %) |
REDVS_S3 |
DEC |
3 |
|
REDVS_S4 |
|
Reduction level 4: Red. of floats bef./aft. prod. (in %) |
REDVS_S4 |
DEC |
3 |
|
REDVS_S5 |
|
Reduction level 5: Red. of floats bef./aft. prod. (in %) |
REDVS_S5 |
DEC |
3 |
|
REDVS_S6 |
|
Reduction level 6: Red. of floats bef./aft. prod. (in %) |
REDVS_S6 |
DEC |
3 |
|
TERM_KPER |
|
Rescheduling in Workforce Planning |
TERM_KPER |
CHAR |
1 |
|
CMACT |
|
Assignment Material Staging Operation Segment |
CMACT |
CHAR |
1 |
|