Menu

SAP Table TCX00

Scheduling: Planning Levels and Control Parameters

The table TCX00 (Scheduling: Planning Levels and Control Parameters) is a standard table in SAP ERP. It belongs to the package CX.

Technical Information

Table TCX00
Short Text Scheduling: Planning Levels and Control Parameters
Package CX
Table Type Transparent Table

Fields for Table TCX00

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
WERKS Plant WERKS_D CHAR 4 T001W
AUFTG Order group for capacity planning AUFTG CHAR 2
AUFTA Order type in capacity planning AUFTA CHAR 4
VAGRP Production Supervisor FEVOR CHAR 3 T024F
PHORI Scheduling horizon (detailed planning) PHORI NUMC 3
APLS1 Selection ID (detailed planning) APLS1 CHAR 2 TCA43
TERM1 Lead time scheduling (detailed planning) TERMX CHAR 1
KAPK1 Indicator: Generate capacity reqmts (detailed planning) KAPKX CHAR 1
PHORI_2 Scheduling horizon (detailed planning, medium term) PHORI_2 NUMC 3
APLS1_2 Selection ID for routing (detailed planning, medium term) APLS1_2 CHAR 2 *
TERM1_2 Lead time scheduling (detailed planning, medium term) TERMX_2 CHAR 1
KAPK1_2 Create capacity requirements (detailed planning,medium term) KAPKX_2 CHAR 1
PHORI_3 Scheduling horizon (detailed planning, long term) PHORI_3 NUMC 3
APLS1_3 Selection ID for routing (detailed planning, long term) APLS1_3 CHAR 2 *
KAPK1_3 Create capacity requirements (detailed planning, long term) KAPKX_3 CHAR 1
TERM1_3 Lead time scheduling (detailed planning, long term) TERMX_3 CHAR 1
LINE_TERM Takt time-/rate-based scheduling of planned order LINE_TERM CHAR 1
RATHR Rate-based planning horizon RATHR NUMC 3
APLS2 Selection ID (rate-based planning) APLS2 CHAR 2 TCA43
TERM2 Lead time scheduling (rate-based planning) TERMX_RATE CHAR 1
KAPK2 Create capacity requirements (rate-based planning) KAPKX_RATE CHAR 1
GROHR Rough-cut planning horizon GROHR NUMC 3
APLS3 Selection ID (rough-cut planning) APLS3 CHAR 2 TCA43
TERM3 Lead time scheduling (rough-cut planning) TERMX_GROB CHAR 1
KAPK3 Create capacity requirements (rough-cut planning) KAPKX_GROB CHAR 1
DADJ1 Scheduling level for adjusting basic dates DADJ1 CHAR 1
DADJ2 Adjust dates in lead time scheduling DADJ2 CHAR 1
DADJ3 Adjusting dates when dispatching planned orders DADJ3 CHAR 1
TERMKZ Scheduling type TERMKZ CHAR 1 T482
TERM_AUTO Indicator: Calculate dates automatically during saving TERM_AUTO CHAR 1
PROT_AUTO Display scheduling log automatically PROT_AUTO CHAR 1
STVERG Maximum number of days start date can be in the past STVERG NUMC 3
MATFRUEH Latest date for material staging LAGE_FR CHAR 1
BREAKS Indicator: Scheduling allowing for breaks BREAKS CHAR 1
PROD_DATES Scheduling based on production dates PROD_DATES CHAR 1
AUF_SHIFT Indicator: Shift order/network AUF_SHIFT CHAR 1
REDST_MAX Maximum reduction level REDST_MAX NUMC 1
RED_ART Reduction type RED_ART CHAR 1
REDVS_S1 Red. of floats before and after production (%) REDVS_S1 DEC 3
REDVS_S2 Reduction level 2: Red. of floats bef./after prod. (in %) REDVS_S2 DEC 3
REDVS_S3 Reduction level 3: Red. of floats bef./aft. prod. (in %) REDVS_S3 DEC 3
REDVS_S4 Reduction level 4: Red. of floats bef./aft. prod. (in %) REDVS_S4 DEC 3
REDVS_S5 Reduction level 5: Red. of floats bef./aft. prod. (in %) REDVS_S5 DEC 3
REDVS_S6 Reduction level 6: Red. of floats bef./aft. prod. (in %) REDVS_S6 DEC 3
TERM_KPER Rescheduling in Workforce Planning TERM_KPER CHAR 1
CMACT Assignment Material Staging Operation Segment CMACT CHAR 1