MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
WERKS |
✔ |
Plant |
WERKS_D |
CHAR |
4 |
T001W |
PAART |
✔ |
Order type |
PAART |
CHAR |
4 |
|
VAGRP |
✔ |
Production Supervisor |
FEVOR |
CHAR |
3 |
T024F |
PHORI |
✔ |
Scheduling horizon (detailed planning) |
PHORI |
NUMC |
3 |
|
TERMKZ |
|
Scheduling type |
TERMKZ |
CHAR |
1 |
T482 |
PRIO1 |
|
Priority 1 for scheduling |
PRIO1_TMHK |
CHAR |
1 |
|
PRIO2 |
|
Priority 2 for scheduling |
PRIO2_TMHK |
CHAR |
1 |
|
PRIO3 |
|
Priority 3 for scheduling |
PRIO3_TMHK |
CHAR |
1 |
|
PRIO4 |
|
Priority 4 for scheduling |
PRIO4_TMHK |
CHAR |
1 |
|
VRGWR |
|
Indicator: Create operations (for capacity leveling) |
FLG_VRGWR |
CHAR |
1 |
|
TERM_AUTO |
|
Indicator: Calculate dates automatically during saving |
TERM_AUTO |
CHAR |
1 |
|
PROT_AUTO |
|
Display scheduling log automatically |
PROT_AUTO |
CHAR |
1 |
|
STVERG |
|
Maximum number of days start date can be in the past |
STVERG |
NUMC |
3 |
|
PLNTM_UPD |
|
Indicator: adjust basic dates |
PLNTM_UPD |
CHAR |
1 |
|
MATFRUEH |
|
Latest date for material staging |
LAGE_FR |
CHAR |
1 |
|
REDST_MAX |
|
Maximum reduction level |
REDST_MAX |
NUMC |
1 |
|
REDVS_S1 |
|
Red. of floats before and after production (%) |
REDVS_S1 |
DEC |
3 |
|
REDVS_S2 |
|
Reduction level 2: Red. of floats bef./after prod. (in %) |
REDVS_S2 |
DEC |
3 |
|
REDVS_S3 |
|
Reduction level 3: Red. of floats bef./aft. prod. (in %) |
REDVS_S3 |
DEC |
3 |
|
REDVS_S4 |
|
Reduction level 4: Red. of floats bef./aft. prod. (in %) |
REDVS_S4 |
DEC |
3 |
|
REDVS_S5 |
|
Reduction level 5: Red. of floats bef./aft. prod. (in %) |
REDVS_S5 |
DEC |
3 |
|
REDVS_S6 |
|
Reduction level 6: Red. of floats bef./aft. prod. (in %) |
REDVS_S6 |
DEC |
3 |
|
BREAKS |
|
Indicator: Scheduling allowing for breaks |
BREAKS |
CHAR |
1 |
|