MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
WERKS |
✔ |
Plant |
WERKS_D |
CHAR |
4 |
T001W |
AUFTG |
✔ |
Order group for capacity planning |
AUFTG |
CHAR |
2 |
|
AUFTA |
✔ |
Order type in capacity planning |
AUFTA |
CHAR |
4 |
|
VAGRP |
✔ |
Production Supervisor |
FEVOR |
CHAR |
3 |
T024F |
PLSCN |
✔ |
Planning Scenario of Long-Term Planning |
PLSCN |
NUMC |
3 |
PLSC |
SCHED_TYPE |
|
Scheduling level |
SCHED_TYPE |
CHAR |
1 |
|
APLS1_LTP |
|
Selection ID for routing (long term planning) |
APLS1_LTP |
CHAR |
2 |
TCA43 |
KAPK1_LTP |
|
Create capacity requirements (long term planning) |
KAPKX_LTP |
CHAR |
1 |
|
TERM1_LTP |
|
Lead time scheduling (long term planning) |
TERMX_LTP |
CHAR |
1 |
|
DADJ2 |
|
Adjust dates in lead time scheduling |
DADJ2 |
CHAR |
1 |
|
DADJ3 |
|
Adjusting dates when dispatching planned orders |
DADJ3 |
CHAR |
1 |
|
TERMKZ |
|
Scheduling type |
TERMKZ |
CHAR |
1 |
T482 |
STVERG |
|
Maximum number of days start date can be in the past |
STVERG |
NUMC |
3 |
|
MATFRUEH |
|
Latest date for material staging |
LAGE_FR |
CHAR |
1 |
|
BREAKS |
|
Indicator: Scheduling allowing for breaks |
BREAKS |
CHAR |
1 |
|
PROD_DATES |
|
Scheduling based on production dates |
PROD_DATES |
CHAR |
1 |
|
REDST_MAX |
|
Maximum reduction level |
REDST_MAX |
NUMC |
1 |
|
REDVS_S1 |
|
Red. of floats before and after production (%) |
REDVS_S1 |
DEC |
3 |
|
REDVS_S2 |
|
Reduction level 2: Red. of floats bef./after prod. (in %) |
REDVS_S2 |
DEC |
3 |
|
REDVS_S3 |
|
Reduction level 3: Red. of floats bef./aft. prod. (in %) |
REDVS_S3 |
DEC |
3 |
|
REDVS_S4 |
|
Reduction level 4: Red. of floats bef./aft. prod. (in %) |
REDVS_S4 |
DEC |
3 |
|
REDVS_S5 |
|
Reduction level 5: Red. of floats bef./aft. prod. (in %) |
REDVS_S5 |
DEC |
3 |
|
REDVS_S6 |
|
Reduction level 6: Red. of floats bef./aft. prod. (in %) |
REDVS_S6 |
DEC |
3 |
|