MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
DARPROF_ID |
✔ |
ID of a user-spec. profile in the table for option profiles |
DARPROF_ID |
CHAR |
10 |
|
HIEVER |
|
Cumulate capacity requirements using work center hierarchy |
HIEVER |
CHAR |
1 |
|
HIEAUF |
|
Explode hierarchy |
HIEAUF |
CHAR |
1 |
|
KUMUL |
|
Indicator, whether cumulated display is desired |
KUMULD |
CHAR |
1 |
|
MINBEL |
|
Minimum load that will be displayed |
MINBELA |
DEC |
3 |
|
MAXBEL |
|
Maximum load that will be displayed |
MAXBELA |
DEC |
3 |
|
RUECKDAT |
|
Offset (in days) of dispatch date for backlog to curr. date |
RDATUM_CNT |
DEC |
5 |
|
PEINHEIT |
|
Unit in which the period duration is specified (day, week..) |
DAPER |
CHAR |
1 |
|
PDAUER |
|
Duration of a period (units as specified in period type) |
DAPED |
DEC |
3 |
|
LIBART |
|
Requirements category (scheduled or remaining) |
CY_SBART |
CHAR |
1 |
|
ZAPER |
|
Type of date specification |
CY_ZAPER |
CHAR |
1 |
|
LIDAVCNT |
|
Offset (in days) of start date for lists to current date |
CY_DCNTV |
DEC |
5 |
|
LIDABCNT |
|
Offset (in days) of end date for lists to current date |
CY_DCNTB |
DEC |
5 |
|
LIEINH |
|
Unit of of measure for displaying capacity requirements |
CY_KEINH |
UNIT |
3 |
T006 |
DAVAP |
|
Distribution according to key in work center or operation |
DAVAP |
CHAR |
1 |
|
HNAME |
|
Name of hierarchy |
CR_HNAME |
CHAR |
10 |
|
HWERKS |
|
Plant |
WERKS_D |
CHAR |
4 |
T001W |
VERTL1 |
|
Distribution of capacity requirements (Planned/prod.order) |
CR_VERTL |
CHAR |
8 |
TC29 |
VERTLN |
|
Distr.cap.reqmts (plant maint.,process order, network) |
CR_VERTLN |
CHAR |
8 |
TC29 |
POOLKAP |
|
Indicator: Cumulated view of the rqmts of pooled capacity |
CY_POOLKAP |
CHAR |
1 |
|
TT_FAUFT |
|
Indicator: Branch to production order - change or display |
CY_TTFAUFT |
CHAR |
1 |
|
TT_PAUFT |
|
Indicator: Branch to planned order display or maintenance |
CY_TTPAUFT |
CHAR |
1 |
|
TT_ARBPL |
|
Switch: Branch to work center - change or display |
CY_TTARBPL |
CHAR |
1 |
|
ANVER |
|
Cumulate available capacity using work center hierarchy |
CY_ANVER |
CHAR |
1 |
|
DATEFROM |
|
Start date for output of capacity evaluations |
CY_DATEF |
CHAR |
10 |
|
DATETO |
|
Finish date for output of capacity evaluations |
CY_DATET |
CHAR |
10 |
|
RDATE_TYPE |
|
Type of date specification |
CY_RDATETY |
CHAR |
1 |
|
RDATE |
|
Date of backlog dispatching |
CY_RDATE |
CHAR |
10 |
|
MRPP |
|
PPC planning calendar |
MRPPP |
CHAR |
3 |
T439G |
UNITSOURCE |
|
Origin of unit of measure for available cap. and cap.reqmts |
CY_UNITSRC |
CHAR |
1 |
|
PPSWERK |
|
Plant |
WERKS_D |
CHAR |
4 |
T001W |