This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table PDBKBESUM (Bauwirtschaft Sozialkassenverfahren: Datensätze BEMEL(Summe)) is a standard table in SAP ERP. It belongs to the package P01B.
Table | PDBKBESUM |
Short Text | Bauwirtschaft Sozialkassenverfahren: Datensätze BEMEL(Summe) |
Package | P01B |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | * |
BNRSK | ✔ | Company Number at a Social Fund - Construction Industry | P01B_BKBNR | NUMC | 8 | |
INPER | ✔ | In-Period for Evaluation for Social Fund Procedure | P01B_BKINP | ACCP | 6 | |
FPPER | ✔ | For-Period for Evaluation for Social Fund Procedure | P01B_BKFUP | ACCP | 6 | |
SEQNO | ✔ | Key Field Sequence Number for SFP Data Records | P01B_BKSEQ | NUMC | 2 | |
KENID | ✔ | Identifier of Record | P01B_BKSID | CHAR | 5 | |
ZVKAS | ✔ | Social Fund | P01B_ZVKAS | CHAR | 2 | * |
STATS | Status of Data Record in Social Fund Procedure | P01B_BKSTA | CHAR | 2 | ||
BESCH | Indicator for Certified Data Record | P01B_BKBES | CHAR | 2 | ||
WERKS | Sending Personnel Area | P01B_BKPEB | CHAR | 4 | * | |
BTRTL | Sending Personnel Subarea | P01B_BKPTB | CHAR | 4 | * | |
RZNSK | Data Center Number of Social Fund (R) | P01B_BKRZE | CHAR | 8 | ||
RZNAG | Data Center Number for Company for Social Fund (R) | P01B_BKRZA | CHAR | 8 | ||
NUS01 | Unused Numeric Field - Length 7 | P01B_BKNU7 | NUMC | 7 | ||
NUS02 | Version Number Component | CHAR2 | CHAR | 2 | ||
RZDAT | Creation Date of Data Medium | P01B_RZDAT | DATS | 8 | ||
VERNR | Version of Data Medium Exchange | P01B_BKVNR | NUMC | 2 | ||
FNAME | Name of Company for Social Fund | P01B_BKFNA | CHAR | 22 | ||
ZVKAN | Employee Number at a Construction Social Insurance Fund | P01B_BKANR | NUMC | 13 | ||
BEGDA | Start Date | BEGDA | DATS | 8 | ||
ENDDA | End Date | ENDDA | DATS | 8 | ||
ABRMO | Payroll Month in Social Fund Procedure | P01B_BKAMO | NUMC | 2 | ||
ABRJA | Payroll Year in Social Fund Procedure | P01B_BKAJA | NUMC | 4 | ||
WAERS | Currency Key for Social Fund Procedure | P01B_BKWAE | CHAR | 3 | ||
BLSUM | Total Gross Wages of All Industrial Employees | P01B_BKBLSUM | NUMC | 10 | ||
ANZGE | Number of Industrial Workers | P01B_BKANZGE | NUMC | 4 | ||
BEIGE | Contribution (Without Trainees Remuneration) | P01B_BKBEIGE | NUMC | 9 | ||
ANZAN | Number of Employees Liable for Contributions (Monthly Cont.) | P01B_BKANZAN | NUMC | 4 | ||
BEIAN | Employee Contribution | P01B_BKBEIAN | NUMC | 8 | ||
ANZTA | Number Days for Employees | P01B_BKANZTA | NUMC | 3 | ||
BEIAT | Daily Contributions for Employees | P01B_BKBEIAT | NUMC | 6 | ||
BLWBU | Total Gross Wages for Winter Constr. Contrib. Indust. Employ | P01B_BKBLWBU | NUMC | 10 | ||
ANZGW | Number of Industrial Workers - Winter Construction Promotion | P01B_BKANZGW | NUMC | 4 | ||
UMLWB | Winter Construction Promotion Contribution | P01B_BKUMLWB | NUMC | 9 | ||
LFDBE | Sequence Number for BEMEL Transferred Each Month | P01B_BKLFDBE | NUMC | 2 | ||
STRME | Tax Code: Notification Portions of Workers, Employees | P01B_BKSTRME | NUMC | 1 | ||
STREG | Tax Code: Notification Supplement Employee Notification Area | P01B_BKSTREG | NUMC | 1 | ||
REPRT | Calling Program | SYCPROG | CHAR | 40 | * | |
UNAME | User Name | UNAME | CHAR | 12 | ||
GDATE | Local Date | SYSTDATLO | DATS | 8 | ||
GTIME | Local Time | SYSTTIMLO | TIMS | 6 |