This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.
Check it out on amazon.com →The table PLMZ (Allocation of bill of material items to operations) is a standard table in SAP ERP. It belongs to the package CP.
Table | PLMZ |
Short Text | Allocation of bill of material items to operations |
Package | CP |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
PLNTY | ✔ | Task List Type | PLNTY | CHAR | 1 | * |
PLNNR | ✔ | Key for Task List Group | PLNNR | CHAR | 8 | |
ZUONR | ✔ | No. for material comp. allocation to task list | CIM_ZUORD | NUMC | 8 | |
ZAEHL | ✔ | Internal counter | CIM_COUNT | NUMC | 8 | |
DATUV | Valid-From Date | DATUV | DATS | 8 | ||
TECHV | Technical status from | TECHV | CHAR | 12 | ||
AENNR | Change Number | AENNR | CHAR | 12 | AENR | |
LOEKZ | Deletion Indicator | LKENZ | CHAR | 1 | ||
PARKZ | Indicator: inactive changes | PARKZ | CHAR | 1 | ||
PLNAL | Group Counter | PLNAL | CHAR | 2 | ||
PLNFL | Sequence | PLNFOLGE | CHAR | 6 | ||
PLNKN | Task list node number for operation | CIM_PLNKN | NUMC | 8 | ||
STLTY | BOM category | STLTY | CHAR | 1 | ||
STLNR | Bill of material | STNUM | CHAR | 8 | ||
STLAL | Alternative BOM | STALT | CHAR | 2 | ||
STLKN | Node Number | KNTNR | NUMC | 8 | ||
WERK_STL | Plant | WERKS_D | CHAR | 4 | MAST | |
ZUDIV | Integral divisor for cutting measures | DZUDIV | NUMC | 5 | ||
ZUMS1 | Cutting measure 1 | DZUMS1 | QUAN | 13 | ||
ZUMS2 | Cutting measure 2 | DZUMS2 | QUAN | 13 | ||
ZUMS3 | Cutting measure 3 | DZUMS3 | QUAN | 13 | ||
ZUMEI | Unit for cutting measures | DZUMEI | UNIT | 3 | T006 | |
IMENG | Component quantity | KMPMG | QUAN | 13 | ||
IMEIN | Component unit of measure | KMPME | UNIT | 3 | T006 | |
ANDAT | Date record created on | ANDAT | DATS | 8 | ||
ANNAM | User who created record | ANNAM | CHAR | 12 | ||
AEDAT | Change date for which no change record is created | CIM_AEDAT | DATS | 8 | ||
AENAM | Name of Person Who Changed Object | AENAM | CHAR | 12 | ||
RGEKZ | Indicator: Backflush | RGEKZ | CHAR | 1 | ||
STLST | Order level | AUFST | NUMC | 2 | ||
STLWG | Order path | AUFWG | NUMC | 2 | ||
REFKN | Number of the task list node | PLNKN | NUMC | 8 | ||
GP_MATNR | Material Number | MATNR | CHAR | 18 | * | |
GP_WERKS | Plant | WERKS_D | CHAR | 4 | * | |
GP_UVORN | Suboperation | UVORN | CHAR | 4 | ||
GP_KRIT1 | Planning object | PLOBJ | CHAR | 18 | ||
GP_FREET | Line text: SOP | LINTX | CHAR | 60 | ||
AOBAR | Type of relationship | AOBAR | CHAR | 2 | ||
ZEINH | Unit for the time interval between relationships | AOBDAUEH | UNIT | 3 | T006 | |
DAUER | Time interval between relationships | AOBDAUER | QUAN | 5 | ||
DMENG | Average component quantity | DKMPMG | QUAN | 13 | ||
KNTTP | Account Assignment Category | KNTTP | CHAR | 1 | T163K | |
FLGEX | Indicator: External procurement | FLGEX | CHAR | 1 | ||
VORAB | Ind: Preliminary order | VORABKZ | CHAR | 1 | ||
STRECKE | Ind.: Third-party requisition | STRECKE | CHAR | 1 | ||
STLTY_W | BOM category | STLTY | CHAR | 1 | ||
STLNR_W | Bill of material | STNUM | CHAR | 8 | ||
STLAL_W | Alternative BOM | STALT | CHAR | 2 | ||
KANTE | Path in exploded BOM tree | KANTE_K | NUMC | 6 | ||
LGORT | Storage location storage resource | LGORT_RES | CHAR | 4 | T001L | |
DISP | Relevancy to Materials Planning/Generation of Purchase Req. | DISP_PLUS_1 | CHAR | 1 | ||
PRODFLOWID | Product Flow Indicator | PRDFLID | CHAR | 4 | ||
BEIKZ | Material Provision Indicator | BEIKZ | CHAR | 1 | * |