SAP Table PRTE

Scheduling Data for Project Item

Recommended Now

All-new Echo Dot Smart speaker with Alexa

This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.

Check it out on amazon.com →

The table PRTE (Scheduling Data for Project Item) is a standard table in SAP ERP. It belongs to the package CN_PSP_TRM.

Technical Information

Table PRTE
Short Text Scheduling Data for Project Item
Package CN_PSP_TRM
Table Type Transparent Table

Fields for Table PRTE

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
POSNR WBS Element PS_POSNR NUMC 8 PRPS
PSPHI Current number of the appropriate project PS_PSPHI NUMC 8 PROJ
PSTRT WBS element: Basic start date PS_PSTRT DATS 8
ESTRT Forecasted start date of the WBS element PS_ESTRT DATS 8
ISTRT Actual start date for the WBS element PS_ISTRT DATS 8
PENDE WBS element: Basic finish date PS_PENDE DATS 8
EENDE Forecasted finish date of the WBS element PS_EENDE DATS 8
IENDE Actual finish date of the WBS element PS_IENDE DATS 8
PDAUR Length (duration) of the basic dates in the WBS element PS_PDAUR QUAN 5
EDAUR Forecasted length (duration) of the WBS element PS_EDAUR QUAN 5
IDAUR Actual length (duration) of the WBS element PS_IDAUR QUAN 5
IEINH Unit for duration of actual WBS element dates PS_IEINH UNIT 3
EEINH Unit for duration of WBS element planned dates PS_EEINH UNIT 3
PEINH Unit for duration of basic WBS element dates PS_PEINH UNIT 3
FLGVG Indicator: There are activities for the WBS elements PS_FLGVG CHAR 1
FLGEW Indicator: Expected dates from the activities PS_FLGEW CHAR 1
FLGEM Indicator: Forecast dates set manually PS_FLGEM CHAR 1
FLGVM Indicator: Basic dates set manually PS_FLGVM CHAR 1
FLGIM Indicator: Actual dates set manually PS_FLGIM CHAR 1
FLGVI Indicator: Actual dates from the activities PS_FLGVI CHAR 1
PSTRM Earliest scheduled start date (Basic) PS_GSTRS DATS 8
PETRM Latest scheduled finish date (basic) PS_GLTRS DATS 8
ESTRM Scheduled start date (Forecast) PS_GSTPP DATS 8
EETRM Latest scheduled finish date (Forecast) PS_GLTPP DATS 8
VISTR Tentative actual start date for WBS element PS_ISTVORL DATS 8
VIEND Tentative actual finish date for WBS element PS_IENVORL DATS 8
PSTRS Latest scheduled start date (basic) PS_GSTRE DATS 8
PETRF Earliest scheduled finish date (basic) PS_GETRE DATS 8
ESTRS Latest scheduled start date (forecast) PS_GSTRP DATS 8
EETRF Earliest scheduled finish date (forecast) PS_GLTRP DATS 8