This bundle contains Amazon Fire TV Stick Lite and Mission USB Power Cable. The USB power cable eliminates the need to find an AC outlet near your TV by powering Amazon Fire TV directly from your TV's USB port. Includes special power management circuitry that enhances the peak power capability of the USB port by storing excess energy and then releasing it as needed.
Check it out on amazon.com →The table TCX0L (Scheduling long term planning: Levels and control parameters) is a standard table in SAP ERP. It belongs to the package CX.
Table | TCX0L |
Short Text | Scheduling long term planning: Levels and control parameters |
Package | CX |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
WERKS | ✔ | Plant | WERKS_D | CHAR | 4 | T001W |
AUFTG | ✔ | Order group for capacity planning | AUFTG | CHAR | 2 | |
AUFTA | ✔ | Order type in capacity planning | AUFTA | CHAR | 4 | |
VAGRP | ✔ | Production Supervisor | FEVOR | CHAR | 3 | T024F |
PLSCN | ✔ | Planning Scenario of Long-Term Planning | PLSCN | NUMC | 3 | PLSC |
SCHED_TYPE | Scheduling level | SCHED_TYPE | CHAR | 1 | ||
APLS1_LTP | Selection ID for routing (long term planning) | APLS1_LTP | CHAR | 2 | TCA43 | |
KAPK1_LTP | Create capacity requirements (long term planning) | KAPKX_LTP | CHAR | 1 | ||
TERM1_LTP | Lead time scheduling (long term planning) | TERMX_LTP | CHAR | 1 | ||
DADJ2 | Adjust dates in lead time scheduling | DADJ2 | CHAR | 1 | ||
DADJ3 | Adjusting dates when dispatching planned orders | DADJ3 | CHAR | 1 | ||
TERMKZ | Scheduling type | TERMKZ | CHAR | 1 | T482 | |
STVERG | Maximum number of days start date can be in the past | STVERG | NUMC | 3 | ||
MATFRUEH | Latest date for material staging | LAGE_FR | CHAR | 1 | ||
BREAKS | Indicator: Scheduling allowing for breaks | BREAKS | CHAR | 1 | ||
PROD_DATES | Scheduling based on production dates | PROD_DATES | CHAR | 1 | ||
REDST_MAX | Maximum reduction level | REDST_MAX | NUMC | 1 | ||
REDVS_S1 | Red. of floats before and after production (%) | REDVS_S1 | DEC | 3 | ||
REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | REDVS_S2 | DEC | 3 | ||
REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | REDVS_S3 | DEC | 3 | ||
REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | REDVS_S4 | DEC | 3 | ||
REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | REDVS_S5 | DEC | 3 | ||
REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) | REDVS_S6 | DEC | 3 |