MANDT |
✔ |
Client |
MANDT |
CLNT |
3 |
T000 |
DISPR |
✔ |
Material: MRP profile |
DISPR |
CHAR |
4 |
|
DISMM |
|
MRP Type |
DISMM |
CHAR |
2 |
T438A |
DISPO |
|
MRP Controller (Materials Planner) |
DISPO |
CHAR |
3 |
T024D |
KZDIE |
|
Indicator: MRP controller is buyer (deactivated) |
KZDIE |
CHAR |
1 |
|
MAABC |
|
ABC Indicator |
MAABC |
CHAR |
1 |
TMABC |
PLIFZ |
|
Planned Delivery Time in Days |
PLIFZ |
DEC |
3 |
|
DZEIT |
|
In-house production time |
DZEIT |
DEC |
3 |
|
FHORI |
|
Scheduling Margin Key for Floats |
FHORI |
CHAR |
3 |
T436A |
SBDKZ |
|
Dependent requirements ind. for individual and coll. reqmts |
SBDKZ |
CHAR |
1 |
|
KZBED |
|
Indicator for Requirements Grouping |
KZBED |
CHAR |
1 |
|
EISBE |
|
Safety Stock |
EISBE |
QUAN |
13 |
|
MINBE |
|
Reorder Point |
MINBE |
QUAN |
13 |
|
DISLS |
|
Lot size (materials planning) |
DISLS |
CHAR |
2 |
T439A |
BSTRF |
|
Rounding value for purchase order quantity |
BSTRF |
QUAN |
13 |
|
BSTMI |
|
Minimum Lot Size |
BSTMI |
QUAN |
13 |
|
BSTMA |
|
Maximum Lot Size |
BSTMA |
QUAN |
13 |
|
BSTFE |
|
Fixed lot size |
BSTFE |
QUAN |
13 |
|
MABST |
|
Maximum stock level |
MABST |
QUAN |
13 |
|
AUSSS |
|
Assembly scrap in percent |
AUSSS |
DEC |
5 |
|
LOSFX |
|
Ordering costs |
LOSFX |
CURR |
11 |
|
LAGPR |
|
Storage costs indicator |
LAGPR |
CHAR |
1 |
T439L |
AUFTL |
|
Splitting Indicator |
AUFTL |
CHAR |
1 |
T439P |
LGRAD |
|
Service level |
LGRAD |
DEC |
3 |
|
WEBAZ |
|
Goods Receipt Processing Time in Days |
WEBAZ |
DEC |
3 |
|
USEQU |
|
Quota arrangement usage |
USEQU |
CHAR |
1 |
TMQ2 |
PERKZ |
|
Period Indicator |
PERKZ |
CHAR |
1 |
|
PERIV |
|
Fiscal Year Variant |
PERIV |
CHAR |
2 |
T009 |
EKGRP |
|
Purchasing Group |
EKGRP |
CHAR |
3 |
T024 |
MRPPP |
|
PPC planning calendar |
MRPPP |
CHAR |
3 |
T439G |
SAUFT |
|
Ind.: Repetitive mfg allowed |
SA_SAUFT |
CHAR |
1 |
|
SFEPR |
|
Repetitive manufacturing profile |
SFEPR |
CHAR |
4 |
T437S |
FXHOR |
|
Planning time fence |
FXHOR |
NUMC |
3 |
|
VRMOD |
|
Consumption mode |
VRMOD |
CHAR |
1 |
|
VINT1 |
|
Consumption period: backward |
VINT1 |
NUMC |
3 |
|
VINT2 |
|
Consumption period: forward |
VINT2 |
NUMC |
3 |
|
DISGR |
|
MRP Group |
DISGR |
CHAR |
4 |
T438M |
KAUSF |
|
Component scrap in percent |
KAUSF |
DEC |
5 |
|
ALTSL |
|
Method for Selecting Alternative Bills of Material |
ALTSL |
CHAR |
1 |
|
MISKZ |
|
Mixed MRP indicator |
MISKZ |
CHAR |
1 |
|
WZEIT |
|
Total replenishment lead time (in workdays) |
WZEIT |
DEC |
3 |
|
VPMAT |
|
Planning material |
VPMAT |
CHAR |
18 |
MARA |
VPWRK |
|
Planning plant |
VPWRK |
CHAR |
4 |
MARC |
VPREF |
|
Conv. factor f. plng material |
VPREF |
CHAR |
10 |
|
TAKZT |
|
Takt time |
TAKZT |
DEC |
3 |
|
RWPRO |
|
Range of coverage profile |
RWPRO |
CHAR |
3 |
T438R |
LFRHY |
|
Planning cycle |
LFRHY |
CHAR |
3 |
T439G |
RDPRF |
|
Rounding Profile |
RDPRF |
CHAR |
4 |
RDPR |
STRGR |
|
Planning strategy group |
STRGR |
CHAR |
2 |
T461P |
SOBSL |
|
Special procurement type |
SOBSL |
CHAR |
2 |
T460A |
RGEKZ |
|
Indicator: Backflush |
RGEKM |
CHAR |
1 |
|
SCHGT |
|
Indicator: Bulk Material |
SCHGT |
CHAR |
1 |
|
WAERS |
|
Currency Key |
WAERS |
CUKY |
5 |
TCURC |
SHFLG |
|
Safety time indicator (with or without safety time) |
SHFLG |
CHAR |
1 |
|
SHZET |
|
Safety time (in workdays) |
SHZET |
NUMC |
2 |
|
MDACH |
|
Action control: planned order processing |
MDACH |
CHAR |
2 |
T46AC |
LGPRO |
|
Issue Storage Location |
LGPRO |
CHAR |
4 |
T001L |
MTVFP |
|
Checking Group for Availability Check |
MTVFP |
CHAR |
2 |
TMVF |
BESKZ |
|
Procurement Type |
BESKZ |
CHAR |
1 |
|
KZECH |
|
Determination of batch entry in the production/process order |
KZECH |
CHAR |
1 |
|
EISLO |
|
Minimum Safety Stock |
EISLO |
QUAN |
13 |
|
PLIFZX |
|
Consider Planned Delivery Time of the MRP Area |
MD_PLIFZ_DB |
CHAR |
1 |
|