This bundle includes Echo Dot (3rd Gen) Charcoal and Philips Hue White A19 Medium Lumen Smart Bulb, 1100 Lumens. Built in Smart Home hub. Ask Alexa to control Zigbee-compatible devices. No additional Philips Hue hub required. Two choices for easy smart lighting - Start setting the mood with Hue Smart bulbs and your Echo device, supporting up to 5 Hue Bluetooth & Zigbee smart bulbs. Add the Hue Hub for whole-home smart lighting (up to 50 light points) and bonus features.
Check it out on amazon.com →The table AEOI (ECH: Object Management Records for Change Master) is a standard table in SAP ERP. It belongs to the package CC.
Table | AEOI |
Short Text | ECH: Object Management Records for Change Master |
Package | CC |
Table Type | Transparent Table |
Field Name | Key | Description | Data Element | Type | Length | Check Table |
---|---|---|---|---|---|---|
MANDT | ✔ | Client | MANDT | CLNT | 3 | T000 |
AENNR | ✔ | Change Number | AENNR | CHAR | 12 | AENR |
AETYP | ✔ | Object Category | AETYP | NUMC | 2 | TCC01 |
OBJKT | ✔ | Identification of object to be changed | AEOBJEKT | CHAR | 40 | |
USOBJ | Change object (internal use) | AEUSOBJ | CHAR | 40 | ||
CCVMS | Future Change Record | CCVMS | CHAR | 1 | ||
OITXT | Object management record description | CC_OITXT | CHAR | 40 | ||
LTXSP | Language: The long text was stored in this language | CC_LTXSP | LANG | 1 | * | |
AEDAT | Date of Last Change | CC_AEDAT | DATS | 8 | ||
AENAM | Name of person who changed object | CC_AENAM | CHAR | 12 | ||
ANDAT | Date record created on | CC_ANDAT | DATS | 8 | ||
ANNAM | User who created record | CC_ANNAM | CHAR | 12 | ||
OBJDT | Date on which the object was last changed | CC_OBJDT | DATS | 8 | ||
OBJNM | User who last changed the object | CC_OBJNM | CHAR | 12 | ||
CCLCK | Indicator: Object locked for changes | CC_CCLCK | CHAR | 1 | ||
AEOST | Baselining for object has been carried out | CC_FLBAS | CHAR | 1 | ||
REVLV | Revision Level | CC_REVLV | CHAR | 2 | ||
AEDTZ | Engineering change management: alternative date counter | AEDTZ | NUMC | 3 | ||
CCSTO | Partial key for status in engineering change management | CCSTO | NUMC | 8 | ||
CCOAA | Change Type for Object | CCOAA | NUMC | 3 | * | |
CONT1 | Digital signature (process improvement) | CC_DSIGN | CHAR | 1 |