SAP Table AFKO

Order header data PP orders

The table AFKO (Order header data PP orders) is a standard table in SAP ERP. It belongs to the package CO.

Technical Information

Table AFKO
Short Text Order header data PP orders
Package CO
Table Type Transparent Table

Fields for Table AFKO

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
AUFNR Order Number AUFNR CHAR 12 AUFK
GLTRP Basic finish date CO_GLTRP DATS 8
GSTRP Basic Start Date PM_ORDGSTRP DATS 8
FTRMS Scheduled release date CO_FTRMS DATS 8
GLTRS Scheduled finish CO_GLTRS DATS 8
GSTRS Scheduled start CO_GSTRS DATS 8
GSTRI Actual start date CO_GSTRI DATS 8
GETRI Confirmed Order Finish Date CO_GETRI DATS 8
GLTRI Actual finish date CO_GLTRI DATS 8
FTRMI Actual release date CO_FTRMI DATS 8
FTRMP Planned release date CO_FTRMP DATS 8
RSNUM Number of Reservation/Dependent Requirement RSNUM NUMC 10 *
GASMG Total scrap quantity in the order GASMG QUAN 13
GAMNG Total order quantity GAMNG QUAN 13
GMEIN Base Unit of Measure MEINS UNIT 3 T006
PLNBEZ Material Number MATNR CHAR 18 MARA
PLNTY Task List Type PLNTY CHAR 1 *
PLNNR Key for Task List Group PLNNR CHAR 8
PLNAW Application of the task list PLNAW CHAR 1 TCA09
PLNAL Group Counter PLNAL CHAR 2
PVERW Task list usage PLN_VERWE CHAR 3 T411
PLAUF Date for routing transfer CO_PLAUF DATS 8
PLSVB To lot size LOSGRBIS QUAN 13
PLNME Task list unit of measure PLNME UNIT 3 T006
PLSVN From Lot Size LOSGRVON QUAN 13
PDATV Valid-From Date DATUV DATS 8
PAENR Change Number AENNR CHAR 12 AENR
PLGRP Responsible planner group/department VAGRP CHAR 3 T024A
LODIV Lot size divisor LOSDIV QUAN 13
STLTY BOM category STLTY CHAR 1
STLBEZ Material Number MATNR CHAR 18 MARA
STLST BOM status STLST NUMC 2 T415S
STLNR Bill of material STNUM CHAR 8
SDATV Valid-From Date DATUV DATS 8
SBMNG Base quantity BASMN QUAN 13
SBMEH Base Unit of Measure MEINS UNIT 3 T006
SAENR Change Number AENNR CHAR 12 AENR
STLAL Alternative BOM STALT CHAR 2
STLAN BOM Usage STLAN CHAR 1 T416
SLSVN From Lot Size LOSVN QUAN 13
SLSBS To Lot Size LOSBS QUAN 13
AUFLD Date of BOM Explosion/Routing Transfer CO_AUFLD DATS 8
DISPO MRP controller for the order CO_DISPO CHAR 3 T024D
AUFPL Routing number of operations in the order CO_AUFPL NUMC 10
FEVOR Production Supervisor FEVOR CHAR 3 T024F
FHORI Scheduling Margin Key for Floats FHORI CHAR 3 T436A
TERKZ Scheduling type TERMKZ CHAR 1 T482
REDKZ Reduction indicator for scheduling REDKZ CHAR 1
APRIO Order priority CO_APRIO CHAR 1
NTZUE Superior network number NETZ_UEBER CHAR 12 AUFK
VORUE Superior activity VORG_UEBER CHAR 4
PROFID Network profile PROFIDNZPL CHAR 7 TCN41
VORGZ Float before production (in days) VORGZ NUMC 3
SICHZ Float after production (in days) SICHZ NUMC 3
FREIZ Release period (in days) FREIZ NUMC 3
UPTER Indicator: Change to Scheduled Dates CO_UPTER CHAR 1
BEDID ID of the capacity requirements record BEDID NUMC 12 *
PRONR Project definition PS_PSP_PRO NUMC 8 PROJ
ZAEHL Internal counter CIM_COUNT NUMC 8
MZAEHL Internal counter CIM_COUNT NUMC 8
ZKRIZ Counter for additional criteria DZKRIZ NUMC 7
PRUEFLOS Inspection Lot Number QPLOS NUMC 12 *
KLVARP Costing variant for planned costs KALKVARPLN CHAR 4 *
KLVARI Costing variant for actual costs KALKVARIST CHAR 4 *
RGEKZ Indicator: Backflushing for order CO_RGEKZ CHAR 1
PLART Basis for scheduling PS_PLART CHAR 1
FLG_AOB Indicator: relationships FLG_AOB CHAR 1
FLG_ARBEI Indicator: Default value work is relevant FLG_ARBEI CHAR 1
GLTPP Finish date (forecast) CO_GLTPP DATS 8
GSTPP Forecast start date CO_GSTPP DATS 8
GLTPS Scheduled forecast finish CO_GLTPS DATS 8
GSTPS Scheduled forecast start CO_GSTPS DATS 8
FTRPS Scheduled release date (forecast) CO_FTRPS DATS 8
RDKZP Reduction indicator for scheduling (forecast) REDKZP CHAR 1
TRKZP Scheduling type (forecast) TERMKZP CHAR 1 *
RUECK Completion confirmation number for the operation CO_RUECK NUMC 10
RMZHL Internal counter CIM_COUNT NUMC 8
IGMNG Yield confirmed from order confirmation CO_IGMNG QUAN 13
RATID ID of the capacity requirements record BEDID NUMC 12 *
GROID ID of the capacity requirements record BEDID NUMC 12 *
CUOBJ Configuration (internal object number) CUOBJ NUMC 18
GLUZS Scheduled finish time CO_GLUZS TIMS 6
GSUZS Scheduled Start (Time) CO_GSUZS TIMS 6
REVLV Revision Level REVLV CHAR 2
RSHTY Object types of the CIM resource CR_OBJTY CHAR 2
RSHID Object ID of the resource CR_OBJID NUMC 8 CRID
RSNTY Object types of the CIM resource CR_OBJTY CHAR 2
RSNID Object ID of the resource CR_OBJID NUMC 8 CRID
NAUTERM Indicator: Do not schedule automatically CO_NAUTERM CHAR 1
NAUCOST Indicator: Do not cost automatically CO_NAUCOST CHAR 1
STUFE Level (in multi-level BOM explosions) HISTU DEC 2
WEGXX Path (for multi-level BOM explosions) WEGXX DEC 4
VWEGX Path (for multi-level BOM explosions) WEGXX DEC 4
ARSNR Number of Reservation/Dependent Requirement RSNUM NUMC 10 *
ARSPS Order Item Number CO_POSNR NUMC 4
MAUFNR Number of superior order MAUFNR CHAR 12 *
LKNOT Left node in collective order CO_LKNOT CHAR 12 *
RKNOT Right node of a collective order CO_RKNOT CHAR 12 *
PRODNET Indicator: Order is part of collective order CO_PRODNET CHAR 1
IASMG Scrap confirmed for order CO_IASMG QUAN 13
ABARB Confirmation: Degree of processing CO_ABARB NUMC 3
AUFNT Number of superior network CO_TEILNET CHAR 12 *
AUFPT Routing number of operations in the order CO_AUFPL NUMC 10
APLZT General counter for order CO_APLZL NUMC 8 *
NO_DISP Effective for Materials Planning NO_DISP_PLUS CHAR 1
CSPLIT Apportionment Structure CSPLIT CHAR 4 MAKV
AENNR Change Number AENNR CHAR 12 AENR
CY_SEQNR Seq. number order CY_SEQNR NUMC 14
BREAKS Indicator: Scheduling allowing for breaks BREAKS CHAR 1
VORGZ_TRM Scheduled float before production in days VORGZ_TRM DEC 6
SICHZ_TRM Scheduled float after production in days SICHZ_TRM DEC 6
TRMDT Date of the last scheduling TRMDT DATS 8
GLUZP Basic finish (time) CO_GLUZP TIMS 6
GSUZP Basic start time CO_GSUZP TIMS 6
GSUZI Actual start time CO_GSUZI TIMS 6
GEUZI Confirmed order finish (time) CO_GEUZI TIMS 6
GLUPP Forecast finish (time) CO_GLUPP TIMS 6
GSUPP Forecast start (time) CO_GSUPP TIMS 6
GLUPS Scheduled forecast finish time CO_GLUPS TIMS 6
GSUPS Scheduled start time (Forecast) CO_GSUPS TIMS 6
CHSCH Search procedure for batch determination KALSMA_CH CHAR 6 T683
KAPT_VORGZ Float (bef. production) remaining after finite scheduling KAPT_VORGZ NUMC 3
KAPT_SICHZ Remaining float after finite scheduling KAPT_SICHZ NUMC 3
LEAD_AUFNR Leading order in current processing CO_LAUFNR CHAR 12 AUFK
PNETSTARTD Outline start of collective network (date) CO_PSTARTD DATS 8
PNETSTARTT Start time of a collective order CO_PSTARTT TIMS 6
PNETENDD Outline finish of collective order (date) CO_PENDD DATS 8
PNETENDT Outline finish time CO_PENDT TIMS 6
KBED Ind: do not create capacity requirements KBED_D CHAR 1
KKALKR Indicator: Components will not be costed COMP_CALC CHAR 1
SFCPF Production Scheduling Profile CO_PRODPRF CHAR 6 TCO43
RMNGA Total confirmed rework quantity RMNGA QUAN 13
GSBTR Overall commitment date CO_GSBTR DATS 8
VFMNG Committed quantity for order acc. to ATP check components CO_VFMNG QUAN 13
NOPCOST Do not calculate planned costs for order CO_NOPCOST CHAR 1
NETZKONT Indicator for the account assignment of a network(hdr/act.) NETZKONT CHAR 1
ATRKZ Request ID ATRKZ CHAR 1
OBJTYPE Change indicator OCM_OBJ_TYPE CHAR 1
CH_PROC Process that has lead to the change of an object OCM_CH_PROC CHAR 1
KAPVERSA Version of Available Capacity KAPVERSA NUMC 2 *
COLORDPROC Collective order with/without automatic goods movement CO_COLORDPRC CHAR 1
KZERB Indicator: Project summarization via master data charact. PS_KZERB CHAR 1
CONF_KEY Identical object CC_CONF_KEY NUMC 8
ST_ARBID Object ID OBJEKTID NUMC 8
VSNMR_V Sales document version number VSNMR_V CHAR 12
TERHW Scheduling note from order scheduling TERHW CHAR 1
SPLSTAT Status of an order in a split hierarchy SPLIT_STAT CHAR 1
COSTUPD Costs are updated CN_COSTUPD CHAR 1
MAX_GAMNG Maximum Value of Total Order Quantity After Distribution CO_MES_MAX_GAMNG QUAN 13
MES_ROUTINGID Key of a Routing from an ME System CO_MES_INT_ROUTINGID CHAR 64
ADPSP PM/PS Reference Element ADCOMPARE CHAR 40 *
RMANR Sales and Distribution Document Number VBELN CHAR 10 *
POSNR_RMA Item number of the SD document POSNR NUMC 6 *
POSNV_RMA Item number of the SD document POSNR NUMC 6 *
Include Structure: CFB_BBD_PPPI_DATA
CFB_MAXLZ Maximum Storage Period MAXLZ DEC 5
CFB_LZEIH Unit for maximum storage period LZEIH UNIT 3 T006
CFB_ADTDAYS Additional Days CFB_ADTDAYS DEC 4
CFB_DATOFM Date of Manufacture CFB_DATOFM DATS 8
CFB_BBDPI Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) CFB_BBD_PPPI DATS 8
OIHANTYP Excise Duty Handling Type OIH_HANTYP CHAR 2 *
MILL_RATIO Factor for Quantity-Based Settlement MILL_RATIO INT4 10
Append Structure: MILL_OC_AFKO
BMEINS Base Unit of Measure MEINS UNIT 3 *
BMENGE Base quantity BASMN QUAN 13
MILL_OC_ZUSKZ Combination Indicator MILL_OC_ZUSKZ CHAR 1