SAP Table PROJ

Project definition

The table PROJ (Project definition) is a standard table in SAP ERP. It belongs to the package CN_PSP_OPR.

Technical Information

Table PROJ
Short Text Project definition
Package CN_PSP_OPR
Table Type Transparent Table

Fields for Table PROJ

Field Name Key Description Data Element Type Length Check Table
MANDT Client MANDT CLNT 3 T000
PSPNR Project definition (internal) PS_INTNR NUMC 8
PSPID Project Definition PS_PSPID CHAR 24
POST1 PS: Short description (1st text line) PS_POST1 CHAR 40
OBJNR Object number J_OBJNR CHAR 22 ONR00
ERNAM Name of Person who Created the Object ERNAM CHAR 12
ERDAT Date on Which Record Was Created ERDAT DATS 8
AENAM Name of Person Who Changed Object AENAM CHAR 12
AEDAT Date on which object was last changed UPDAT DATS 8
KIMSK Selection mask for WBS element short IDs PS_KIMSK CHAR 24
AUTOD Automatic value transfer from WBS element to project def. PS_AUTOD CHAR 1
STSPD Status profile for project definition PS_STSPD CHAR 8 TJ20
STSPR Status profile for WBS element PS_STSPR CHAR 8 TJ20
VERNR Number of the responsible person (project manager) PS_VERNR NUMC 8 TCJ04
VERNA Name of responsible person (Project manager) PS_VERNA CHAR 25
ASTNR Applicant number PS_ASTNR NUMC 8 TCJ05
ASTNA Applicant PS_ASTNA CHAR 25
VBUKR Company code for the project PS_VBUKR CHAR 4 T001
VGSBR Business area for the project PS_VGSBR CHAR 4 TGSB
VKOKR Controlling area for the project PS_VKOKR CHAR 4 TKA01
PRCTR Profit Center PRCTR CHAR 10 CEPC
PWHIE WBS currency (project definition) PS_PWHIE CUKY 5 TCURC
ZUORD Network assignment PS_ZUORD NUMC 1
TRMEQ Indicator: WBS dates detailed by activity dates PS_TRMEQ CHAR 1
PLFAZ Project planned start date PS_PLFAZ DATS 8
PLSEZ Project planned finish date PS_PLSEZ DATS 8
WERKS Plant WERKS_D CHAR 4 T001W
KALID Factory calendar key FABKL CHAR 2 TFACD
VGPLF Planning method for project basic dates PS_VGPLF NUMC 1
EWPLF Planning method for project forecast dates PS_EWPLF NUMC 1
ZTEHT Time unit in time scheduling PS_ZTEHT UNIT 3 T006
NZANZ Indicator: Network header visible to end user NETZOBERFL CHAR 1
PLNAW Application of the task list PLNAW CHAR 1 TCA09
VPROF Network profile PROFIDNZPL CHAR 7 TCN41
PROFL Project Profile PROFIDPROJ CHAR 7 TCJ41
BPROF Budget Profile BP_BPROFIL CHAR 6 TBP1C
TXTSP Language Key SPRAS LANG 1 T002
KOSTL Cost Center KOSTL CHAR 10 CSKS
KTRG Cost Object KSTRG CHAR 12 CKPH
AEDTE Date of last scheduling of the overall network (basic dates) PS_AEDTE DATS 8
AEDTP Date of last scheduling of the overall network (forecast) PS_AEDTP DATS 8
BERST Authorization key for project master data PS_BERST CHAR 16
BERTR Authorization key for project dates (WBS) PS_BERTR CHAR 16
BERKO Authorization key for costs and revenues PS_BERKO CHAR 16
BERBU Authorization key for project budget PS_BERBU CHAR 16
SPSNR Current number for standard project PS_ISPSP NUMC 8 PROJS
BESTA Project stock PS_BESTAND CHAR 1
SCOPE Object Class SCOPE_CV CHAR 2
XSTAT Statistical WBS element PS_XSTAT CHAR 1
TXJCD Tax Jurisdiction TXJCD CHAR 15 TTXJ
ZSCHM Interest Profile for Project/Order Interest Calculation PS_ZSCHM CHAR 7 TPI01
SCPRF Profile for WBS scheduling PS_SCHDPRF CHAR 12 TCXPS
IMPRF Investment measure profile IM_PROFIL CHAR 6 TAPRF
FMPRF Payment plan profile PSFM_PRF CHAR 6 TBP1C
ABGSL Results Analysis Key ABGR_SCHL CHAR 6 TKKAA
POSTU PS: Short description (1st text line) in all caps PS_POSTU CHAR 40
PPROF Planning profile BP_PPROFIL CHAR 6 TBP1C
PLINT Indicator for Integrated Planning PLINT CHAR 1
LOEVM Deletion Indicator LOEVM CHAR 1
INACT Indicator: Project definition inactive PS_INACT CHAR 1
KZBWS Valuation of Special Stock KZBWS CHAR 1
SMPRF Simulation profile SIM_PROFIL CHAR 7 TCN54
FLGVRG Indicator: Bottom-up calculation with activity dates PS_FLGVRG CHAR 1
GRTOP Indicator: Automatic requirements grouping GRONTOP CHAR 1
PGPRF Distribution profile PGPROFID CHAR 6 TPGPRF
STORT Location PS_STORT CHAR 10 T499S
LOGSYSTEM Logical System LOGSYSTEM CHAR 10 *
KZERB Indicator: Project summarization via master data charact. PS_KZERB CHAR 1
PARGR Partner Determination Procedure PARGR CHAR 4 V_TVPG_S
FUNC_AREA Functional Area FKBER CHAR 16 TFKB
VKORG Sales Organization VKORG CHAR 4 TVKO
VTWEG Distribution Channel VTWEG CHAR 2 TVKOV
SPART Division SPART CHAR 2 TVTA
DPPPROF Dynamic Item Processor Profile AD01PROFNR CHAR 8 AD01C_PROF
VPKSTU Node level SEU_LEVEL NUMC 2
PSPID_EDIT Project Number (External) Edited PS_PSPID_EDIT CHAR 24
VNAME Joint Venture JV_NAME CHAR 6 T8JV
RECID Recovery Indicator JV_RECIND CHAR 2 T8JJ
ETYPE Equity type JV_ETYPE CHAR 3 T8JE
OTYPE Joint Venture Object Type JV_OTYPE CHAR 4
JIBCL JIB/JIBE Class JV_JIBCL CHAR 3 T8J6A
JIBSA JIB/JIBE Subclass A JV_JIBSA CHAR 5 T8J6C
ZFILEPATH Character field of length 40 CHAR40 CHAR 40
ZFILE1NAME Char 20 CHAR20 CHAR 20
ZFILE1EXTE 3-Byte field CHAR3 CHAR 3
ZFILE2NAME Char 20 CHAR20 CHAR 20
ZFILE2EXTE 3-Byte field CHAR3 CHAR 3
ZFILE3NAME Char 20 CHAR20 CHAR 20
ZFILE3EXTE 3-Byte field CHAR3 CHAR 3
SCHTYP Scheduling scenario PS_SCHED_TYPE CHAR 1
SPROG Forecast start date of project definition PS_SPROG DATS 8
EPROG Forecast finish date for project definition PS_EPROG DATS 8
CPD_UPDAT Time Stamp /CPD/PFP_TSTMP DEC 15
FERC_IND Regulatory indicator FE_IND CHAR 4 FERC_C7
PROJ_STATUS Status Combination ACTCMB_DELE INT1 3 ACTCMB_TAB